11open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
62dto Annual boiler inspection (5 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 62 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (5 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-18 (Accepted). Agency page

Dec 31, 2026
in 62 days
5 of 5 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 28,800 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 183 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 183 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1158 days
Next cycle year 2029

Open violations

ECB / OATH (11)
IssuedViolationHearingBalance
Jul 15, 2026Construction CLASS - 2
EXIT DOOR NOT SELF CLOSING.NOTED:EMERGENCY EXTERIOR EXIT DOOR NOT SELFCLOSING DUE TO BINDING,MISSING AND OR FAULTY HARDWARE ON EXTERIOR EXIT#5 FIRST FLOOR OBSERVED WHEN TESTED.REM:REPAIR/REPLACE DOOR.
#35734705K
Aug 5, 2026
POP/IN-VIO
$0
Jul 15, 2026Construction CLASS - 2
28-301.1 UNLAWFUL PLACEMENT OF FURNISHINGS,DECORATIONS OR OTHER OBJECTS AT EXITS THAT OBSTRUCT ACCESS TO,EGRESS FROM OR VISIBILITY THEREOF PER FDNY 2008 CODE;FC 1027.4.NOTED:AT STAIRWELLS C AND D 2ND FL AT REAR
#35734704Z
Aug 5, 2026
POP/IN-VIO
$0
Jul 15, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPIANT MANNER.NOTED:AT ROOF LEVEL FLAGPOLE PULLEY BROKEN AND INOPERABLE WITH NO FLAG VISIBLE AT THE TIME OF INSPECTION.REM:REPAIR AND/OR REPLACE.
#35734709H
Aug 5, 2026
POP/IN-VIO
$0
Jul 15, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:FIRE RATEDCLASSROOMS AND SMOKE DOORS NOT SELF CLOSING DUE TO BINDING,MISSING ANDOR FAULTY HARDWARE IN CLASSROOMS 438,405,434,348,342,307,310,314,317,3
#35734706M
Aug 5, 2026
POP/IN-VIO
$0
Jul 15, 2026Construction CLASS - 2
REISSUE ON ECB#35725121M FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT STAIRWELL E AND F STEP CRACKS ON CMU BLOCK WALL NOTICED WITH VISIBLE MOVEMENT GAUGES SET ON WALL FOR FUTURE POSSIBLE STRUC
#35734703R
Aug 5, 2026
POP/IN-VIO
$0
Jul 15, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:EMERGENCY ILLUMINATED DISCHARGE EXIT AND EXIT SIGNS NOT WORKING WHEN T
#35734707Y
Aug 5, 2026
POP/IN-VIO
$0
Jul 15, 2026Construction CLASS - 2
REISSUE ON ECB#35725120K FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:ROOFING MATERIAL AT ROOF LEVEL COMPROMISED AND FAILURE CAUSING WATER PENETRATION AND ROOF LEAKS IN CLASSROOMS 316 AND 217 OBS
#35734702P
Aug 5, 2026
POP/IN-VIO
$0
Jul 15, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:ELECTRIC SWITCH GEAR PANEL ROOM IN ROOM 345 AND 245 WITH MATERIALS CONTAINING JANITORIAL PRODUCTS,COMBUSTIBLES AND WAGONS/CARTS,OBSERVED UPON INSPECTI
#35734708X
Aug 5, 2026
POP/IN-VIO
$0
Sep 11, 2025Construction CLASS - 2
EXIT DOORS OR CORRIDORS EXIT ARE NOT SELF CLOSING PROPERLY AT THE TIMEOF INSPECTION.AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 2ND FLOOR NEAR RM 211 TWO CORRIDOR EXIT DOORS AT 3RD FLOOR NEAR RM 311 TWO EXI
#35725119N
Oct 9, 2025
POP/IN-VIO
$0
Sep 11, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED AND NOTED AT STAIR WAY E AND F CRACKS IN STAIRWELL WALLS AT DIFFERENT FLOORS.REM:REPAIR OR REPLACE ALL CRACKS IN STAIRWEL
#35725121M
Oct 9, 2025
POP/IN-VIO
$0
Sep 11, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 3RD FLOOR OF THE BUILDING ROOM NO-316,317 FOR ROOF LEAKING WATER PENETRATION AT ROOM.REM:REPAIR OR REPLACE R
#35725120K
Oct 9, 2025
POP/IN-VIO
$0
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Jul 15, 2026ECBConstruction: EXIT DOOR NOT SELF CLOSING.NOTED:EMERGENCY EXTERIOR EXIT DOOR NOT SELFCLOSING DUE TO BINDING,MISSING AND OR FAULTY HARDWARE ON EXTERIOR EXIT#5 FIRST FLOOR OBSERVED WHEN TESTED.REM:REPAIR/REPLACE DOOR.Open
Jul 15, 2026ECBConstruction: 28-301.1 UNLAWFUL PLACEMENT OF FURNISHINGS,DECORATIONS OR OTHER OBJECTS AT EXITS THAT OBSTRUCT ACCESS TO,EGRESS FROM OR VISIBILITY THEREOF PER FDNY 2008 CODE;FC 1027.4.NOTED:AT STAIRWELLS C AND D 2ND FL AT REAROpen
Jul 15, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPIANT MANNER.NOTED:AT ROOF LEVEL FLAGPOLE PULLEY BROKEN AND INOPERABLE WITH NO FLAG VISIBLE AT THE TIME OF INSPECTION.REM:REPAIR AND/OR REPLACE.Open
Jul 15, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:FIRE RATEDCLASSROOMS AND SMOKE DOORS NOT SELF CLOSING DUE TO BINDING,MISSING ANDOR FAULTY HARDWARE IN CLASSROOMS 438,405,434,348,342,307,310,314,317,3Open
Jul 15, 2026ECBConstruction: REISSUE ON ECB#35725121M FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT STAIRWELL E AND F STEP CRACKS ON CMU BLOCK WALL NOTICED WITH VISIBLE MOVEMENT GAUGES SET ON WALL FOR FUTURE POSSIBLE STRUCOpen
Jul 15, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:EMERGENCY ILLUMINATED DISCHARGE EXIT AND EXIT SIGNS NOT WORKING WHEN TOpen
Jul 15, 2026ECBConstruction: REISSUE ON ECB#35725120K FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:ROOFING MATERIAL AT ROOF LEVEL COMPROMISED AND FAILURE CAUSING WATER PENETRATION AND ROOF LEAKS IN CLASSROOMS 316 AND 217 OBSOpen
Jul 15, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:ELECTRIC SWITCH GEAR PANEL ROOM IN ROOM 345 AND 245 WITH MATERIALS CONTAINING JANITORIAL PRODUCTS,COMBUSTIBLES AND WAGONS/CARTS,OBSERVED UPON INSPECTIOpen