Queens · Block 2803 · Lot 28 · 11373

54-14 74 Street

5 floors · 22,284 sq ft · built 2007 · class O5 · owner of record: 5414 Capital Llc

6open violations
$625ECB/OATH penalties owed
0HPD class C (immediately hazardous)
1153dto Gas piping inspection (2029 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 57 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1153 days
Next cycle year 2029

Open violations

ECB / OATH (2) · $625 owed
IssuedViolationHearingBalance
Jan 17, 2023Elevators CLASS - 2
1L10,25M7,25M7,40B16:EMERGENCY STOP SWITCH IN CAR DEFECTIVE AND NO BUZZER. REQUIRED SIGNAGE MISSING IN THE LOBBY FOR THE CONTROL SPACE. NO INFORMATION POSTED IN THE LOBBY TO CONTACT ANYONE FOR KEYS OR WHO IS RE
#38274653M
Mar 28, 2023
STIPULATION/IN-VIO
$625
Aug 28, 2010Construction CLASS - 1
WORK W/O A PERMIT AS NOTED: @ TIME OF INSPECTION @ ABOVE ACTIVE SITE OBSERVED DEMO OF PARAPET WALL @ ROOF LEVEL ON EXPOSURE 1 IN PROGRESS AS PER DOB RECORDS THERE IS NO PERMIT AVAILABLE ON FILE PARTIAL STOP WOR
#34860885H
Oct 4, 2011
IN VIOLATION
$0
DOB (0)

None open.

DOB NOW Safety (5)
IssuedViolationStatus
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Report
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 4, 2026, 3:10 AM ET. BBL 4028030028.

Look up another building