11 floors · 61,700 sq ft · built 2010 · class H3 · owner of record: Tsq Hotel Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1076). Agency page | Dec 31, 2026 in 47 days | Due this year |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $376,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 99 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 61,700 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 9, 2026 | Construction CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. NOTED AT THE TIME OF INSPECTION I OBSERVED DEFECTIVE/INADEQUATE SHED CONDITIONS I.E. DAMAGED/ROTTED MUDSILLS ON MULTIPLE LOCATIONS AND DAMAGED/ROTTED PAR #35730869Z | Nov 19, 2026 PENDING | $2,400 |
| Feb 3, 2026 | Construction CLASS - 2 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS.AS NOTED:AT THE TIME OF INSPECTION I OBSERVED ON SIDEWALK SHED:ROTTED PARAPET PANELS,DAMAGEDPARAPET PANELS AT SEVERAL LOCATIONS.REM:CONFORM SHED TO CODE SPECIFICA #35717892K | Apr 9, 2026 DEFAULT | $10,000 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 8A & 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #918458.REMEDY:SUBMIT ACCEPTABLE REQUIR #37023956R | Feb 23, 2023 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 9, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTED AT THE T IME OF INSPECTION,I OBSERVED AT EXPOSURE 3 CRACK WINDOW PANE ON 2ND FL REMEDY:REPAIR AND/OR REPLACE #SR10402JR | DOB VIOLATION - ACTIVE |
| Feb 3, 2026 | CONSTRUCTION FTM BLDG. OBSRVD ON EXP 1,2&4 MISSING COPING STONE @ SOME SECTION ON PARAPET. EXP 1 N.ELEV DAMAGED MORTAR JOINTS ON PARAPET BRICK WRK. EXP3 W.ELEV: DAMAGED, DEMOLISHED BRICK WALL, FROM 2ND FLR TO PARAPET REMEDY: REPAIR/REPLACE DAMAGED MASONRY BRICKS & COPING STONE & DMAGED MORTAR JOINTS #SR0402RF | DOB VIOLATION - ACTIVE |
| Sep 12, 2024 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTE: OBSERVE @ EXP 4(W.ELEV) LARGE VERTICLE CRACKS @ MASONRY ON SW CORNER. ALSO OBSERVED OPEN SECTIONS OF BRICKS @ EXP#1/3 (N/S ELEV) NE & SE CORNERS, AND MISSING COPING @ ROOF PARAPET WALL & LARGE STEP CRACKS AT BULKHEAD ON SE/SW CORNERS. RE #SR10402YK | DOB VIOLATION - ACTIVE |
| Jun 3, 2024 | HAZARDOUS CONDITION (FACADE) CYCLE 9A UNSAFE REPORT FILED #911854 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jun 3, 2024 | Facades FISPHAZ CYCLE 9A UNSAFE REPORT FILED | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 9, 2026 | DOB | CONSTRUCTION: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTED AT THE T IME OF INSPECTION,I OBSERVED AT EXPOSURE 3 CRACK WINDOW PANE ON 2ND FL REMEDY:REPAIR AND/OR REPLACE | Open |
| Sep 9, 2026 | ECB | Construction: PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. NOTED AT THE TIME OF INSPECTION I OBSERVED DEFECTIVE/INADEQUATE SHED CONDITIONS I.E. DAMAGED/ROTTED MUDSILLS ON MULTIPLE LOCATIONS AND DAMAGED/ROTTED PAR | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 4:56 PM ET. BBL 1010760051.