4 floors · 8 apartments · 5,496 sq ft · built 2018 · class C1 · owner of record: Shg 538 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 775 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 17, 2019 | Construction CLASS - 1 HOUSEKEEPING AT TIME OF INSPECTION OF NEW 4 STORY BUILDING ACTIEV JOBSITE WORK IN PROGRESS I OBSERVED LARGE AMOUNTS OF CONSTRUCTION DEBRI SAND MATERIALS SCATTERED THROUGHOUT JOBSITE THIS CONDITION CREATES A TRI #35440802Z | Sep 27, 2019 IN VIOLATION | $625 |
| Jul 17, 2019 | Construction CLASS - 1 3301.2:FAILURE TO MAINTAIN9STAIRS IN FILLS) AT TIME OF INSPECTION OF NEW 4 STORY BUIDLING ACTIEV JOBSIT EI OBSERVED MISSING STAIR INFILLS THROUGHOUT JOBSITE STAIRS ALSO I OBSERVED WOOD USED IN SOME INFILLS WERE #35440805Y | Sep 27, 2019 IN VIOLATION | $625 |
| Jul 17, 2019 | Construction CLASS - 1 3303.7.2:FIRE EXTINGUISHER AT TIME OF INSPECTION OF NEW 4 STORY BUILDING ACTIEV JOBSITE I OBSERVED MISSING FIRE EXTINGUISHERS THROUGHOUT JOBSITE THIS CONDITION CREATES AN UNSAFE CONDITION IN CASE OF FIRE PROVID #35440804M | Sep 27, 2019 IN VIOLATION | $625 |
| May 24, 2019 | Unknown CLASS - 2 THE INSTALLED WINDOWS ON EXP. #1 & #3 FROM 1ST. TO 4TH. FLOOR WITH U-FACTOR: U-0.29 CONTRARY TO U-0.27 INDICATED ON PAGE EN-001.00 & WINDOW SCHEDULES ON PAGE A-006.00.IT IS PERMITTED TO PERFORM WORK TO CORRECT #39003354Y | Nov 15, 2019 IN VIOLATION | $1,250 |
| May 24, 2019 | Unknown CLASS - 2 THE INSTALLED EXTERIOR WALLS ON EXPOSURE #1,#2,#3 & #4 FROM 1ST. TO 4TH. FLOOR WITH 8" CMU WALLS CONTRARY TO METAL FRAMED WALL INDICATED ON EXTERIOR WALL DETAILS ON PAGE A-007.00 & ENERGY ANALYSIS ON PAGE EN-00 #39003352K | Nov 15, 2019 IN VIOLATION | $1,250 |
| Apr 17, 2019 | Construction CLASS - 2 SEC. 3301-02 CONSTRUCTION SUPERINTENDENT FAILS TO MAINTAIN &/OR MAKE JOBSITE LOGS AVAILABLE. AT THE TIME OF MY INSPECTION OF A 4 STY NEWE BLDG I DID NOT OBSERVE AN ADEQUATE LOG BOOK. PROPOSED WHEN I ASKED FOR #35405476Z | Nov 8, 2019 IN VIOLATION | $625 |
| Apr 17, 2019 | Construction CLASS - 1 SEC. 3301.7 DOCUMENTS TO BE KEPT ON SITE: DESIGN DRAWINGS. AT THE TIMEOF MY INSPECTION OF A PROPOSED 4 STY NEW BLDG I OBSERVED 2 LADDERS & APLATFORM MADE FOR ALL WORKERS TO GET TO FROM THE 3RD L TO 4. I ASKED #35405299R | Nov 8, 2019 IN VIOLATION | $1,250 |
| Apr 17, 2019 | Site Safety CLASS - 1 CONSTRUCTION SUPERINTENDENT FAILED TO PERFOM DUTIES AS PER RULE. NO SUPERINTENDENT/COMPETENT PERON ON SITE. AT THE TIME OF MY INSPECTION OF A PROPOSED 4 STY NEW BLDG I OBSERVED WORKERS SETTING UP SCAFFOLDING ON #35405297N | Nov 8, 2019 IN VIOLATION | $2,500 |
| Apr 17, 2019 | Construction CLASS - 1 FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. AT THE TIME OF MY INSPECTION OF A 4 STY NEW BLDG I OBSERVED THE DOOR TO ENTER SITE OPEN AT EXP#1. THERE WAS MASONRY DEBRIS ON THE #35405298P | Nov 8, 2019 IN VIOLATION | $5,000 |
| Apr 17, 2019 | Construction CLASS - 1 SEC. 3303.2.3.1 TEMPORARY LIGHTING FOR CONSTRUCTION SITES. AT THE TIMEOF MY INSPECTION OF A PROPOSE 4 STY NEW BLDG I OBSERVED WORKER ONSITE WORKING. THE BLDG W/NONE LIGHTING PROVIDED BY THE CONTRACTOR WAS NONE #35405475R | Nov 8, 2019 IN VIOLATION | $625 |
| Feb 7, 2019 | Construction CLASS - 1 3309.14 FAILURE TO PROVIDE WINDOW PROTECTION.@TIME OF INSP @JOBSITE,ITWAS TAHT RESIDENTIAL WINDOWS @EXP #4 IN APPROX 3FT WERE NOT PROTECTED FROM CONCRETE OPERATIONS.FAILURE TO PROTECT WINDOWS CREATES A HAZARDOU #35385715L | Dec 6, 2019 IN VIOLATION | $2,500 |
| Feb 7, 2019 | Construction CLASS - 1 3305.3.5.2 CONST LOADS.@TIME OF INSP ON ACTIVE JOBSITE OBSERVED THAT FL BOARDS WERE BROKEN W/HEAVY LOADS OF PALLETS OF CONCRETE BAGS & CMU BLOCKS,ALSO LARGE AMOUNTS OF DEBRIS.UPON REVIEWING APPROVED PLANS ON SI #35385713H | Dec 6, 2019 IN VIOLATION | $2,500 |
| Feb 7, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING.@TIME OF INSP ON ACTIVE JOBSITE IT WAS OBSERVED HAT @REAR EXP #3 IT WAS FULL OF DEBRIS,BLDG MATERIALS & GARBAGE,AT TOP OF STAIRS ON 2ND FL BLDG MATERIALS,DEBRIS SCATTER #35385717P | Dec 6, 2019 IN VIOLATION | $2,500 |
| Feb 1, 2019 | Construction CLASS - 1 FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED. AT TIME OF INSPECTIONI OBSERVED A NEW BUILDING AT THE SECOND STORY LEVEL WITH CMU WALL AT EXP 1 STILL UNDER CONSTRUCTION W/O OVERHEAD PROTECTION IN PLACE.PROPOSE #35385730J | Mar 13, 2020 IN VIOLATION | $10,000 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 29, 2026 | B | Apt 1B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 3, 2026 |
| May 29, 2026 | C | Apt 3B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 24, 2026 |
| May 29, 2026 | C | Apt 3B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 24, 2026 |
| Sep 26, 2023 | C | Apt 2A · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APA | Oct 22, 2023 |
| Aug 17, 2023 | B | Apt 2B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE SLIDING DOOR CASING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 21, 2023 |
| Aug 17, 2023 | B | Apt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING DOOR CASING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 21, 2023 |
| Aug 17, 2023 | B | Apt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AROUND WINDOW CASING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 21, 2023 |
| Nov 21, 2022 | C | Apt 1B · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Nov 21, 2022 |
| Oct 11, 2022 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM BASEMENT DOOR LOCKED AT BOILER ROOM | Oct 17, 2022 |
| Sep 15, 2022 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Sep 21, 2022 |
| Aug 29, 2022 | B | Apt 1A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 3, 2022 |
| Oct 25, 2021 | B | Apt 1B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 29, 2021 |
| Sep 23, 2021 | B | Apt 2B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 28, 2021 |
| Sep 23, 2021 | B | Apt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 28, 2021 |
| Sep 23, 2021 | B | Apt 2B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AROUND WINDOW FRAME IN THE 1st ROOM FROM NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 28, 2021 |
| Sep 23, 2021 | B | Apt 2B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AROUND WINDOW FRAME IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 28, 2021 |
| Aug 5, 2021 | C | Apt 3B · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 5, 2021 |
| Aug 5, 2021 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Aug 11, 2021 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 9:53 AM ET. BBL 2022680021.