Bronx · Block 2768 · Lot 91 · 10474

538 Craven Street

1 floors · 4,500 sq ft · built 1933 · class F5 · owner of record: 538 Caven Realty Corp

7open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
1158dto Gas piping inspection (2029 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 62 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1158 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-05 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Oct 22, 2021Construction CLASS - 1
WORK W/OUT PERMIT.OBSERVED AT GROUND LEVEL OF BLDG A NEWLY INSTALLED BATHROOM W/WATER SUPPLY & DRAIN INSTALLED IN WALL.WORK IS APPROX. 50% COMPLETE.NO PERMITS ON FILE.REMEDY:OBTAIN PERMITS ON FILE.REMEDY:OBTAI
#35459675P
Jan 21, 2022
ADMIT/IN-VIO
$0
Nov 15, 2005Boilers Non-Hazardous
18A/32A/50A/50B/21B/34B. 50A- INSTALL A SYPHON ON THE STEAM GAUGE. 50BINSTALL GUARDS ON GLASS.
#32048945K
Feb 17, 2006
IN VIOLATION
$0
DOB (2)
IssuedViolationStatus
Sep 23, 2024HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
#00246
DOB VIOLATION - ACTIVE
Sep 23, 2024HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
#01094
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 2)
Active
Sep 23, 2024Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
Active
Sep 23, 2024Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 30, 2026, 7:34 AM ET. BBL 2027680091.

Look up another building