Manhattan · Block 760 · Lot 46 · 10018

537 8 Avenue

6 floors · 14,750 sq ft · built 1928 · class O5 · owner of record: Mo 37 Llc

7open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
64dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 64 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-16 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Jul 4, 2008Construction CLASS - 2
FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. LOOSE SPALLING CONCRETE AT UNDERSIDE OF 2ND FLOOR BALCONY. REMAINING BALCONY'S HAVE CRACKS AT VARIOUS LOCATIONS. REMEDY. FILE PLANS OBTAIN ALL APPROVALS & PERMIT
#34685001H
Nov 3, 2008
STIPULATION/IN-VIO
$0
DOB (2)
IssuedViolationStatus
May 9, 2001CONSTRUCTION

#MTF12RNS
DOB VIOLATION - ACTIVE
Aug 9, 1993ZONING

#MTF8RI
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 4)
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 5:42 PM ET. BBL 1007600046.

Look up another building