3 floors · 6 apartments · 3,200 sq ft · built 1901 · class C2 · owner of record: Derrick Oates
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 412 days | Next cycle year 2027 |
None open.
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 19, 2025 | B | Apt 3 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING, EAST AND NORTH WALLS IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 26, 2025 |
| Feb 19, 2025 | B | Apt 3 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 26, 2025 |
| Feb 19, 2025 | B | Apt 3 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK EAST AND NORTH WALLS IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 26, 2025 |
| Feb 19, 2025 | B | § 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF A BICYCLE, STORAGE CARTS, KIDS TOYS AND OTHER HOUSEHOLD ITEMS AT PUBLIC HALL, 1st STORY | Mar 26, 2025 |
| Feb 19, 2025 | B | Apt 3 · § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHUB IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 26, 2025 |
| Feb 19, 2025 | B | Apt 3 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT WEST AND EAST WALLS IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 26, 2025 |
| Feb 19, 2025 | B | Apt 3 · § 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING SHUT OFF VALVE AT RADIATOR AT SOUTH WALL IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 26, 2025 |
| Feb 19, 2025 | B | Apt 3 · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 26, 2025 |
| Feb 19, 2025 | B | Apt 3 · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 26, 2025 |
| Oct 23, 2024 | B | Apt 3 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 27, 2024 |
| Oct 23, 2024 | B | Apt 3 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ FT AT EAST, SOUTH AND WEST WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 27, 2024 |
| Oct 23, 2024 | C | Apt 3 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME, 1st DOOR FRAME FROM WEST AT NORTH WALL | Nov 16, 2024 |
| Oct 23, 2024 | C | Apt 3 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 3, 3rd STORY, 1st A | Nov 16, 2024 |
| Oct 23, 2024 | C | Apt 3 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE | Nov 16, 2024 |
| Oct 23, 2024 | C | Apt 3 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN TH | Nov 16, 2024 |
| Oct 23, 2024 | C | Apt 3 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME, 1st DOOR FRAME FROM WEST AT NORTH WALL, | Nov 16, 2024 |
| Mar 6, 2019 | B | Apt 3 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 10, 2019 |
| Jan 9, 2018 | B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AND ALL WALLS AT PUBLIC HALL, 3rd STORY | Feb 13, 2018 |
| Aug 8, 2013 | B | Apt 1B · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 12, 2013 |
| Aug 8, 2013 | B | Apt 1B · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AND ALL WALLS IN THE FOYER LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 12, 2013 |
| Aug 8, 2013 | B | Apt 1B · § 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE UPPER AND LOWER SASH OF WINDOW IN THE 1st ROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 12, 2013 |
| Aug 8, 2013 | B | Apt 1B · § 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE UPPER AND LOWER SASH OF WINDOWS IN THE 3rd ROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 12, 2013 |
| Aug 8, 2013 | B | Apt 1B · § 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET ON WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 12, 2013 |
| Aug 8, 2013 | B | Apt 1B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE HARDWOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 12, 2013 |
| Aug 8, 2013 | B | Apt 1B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 12, 2013 |
| Aug 8, 2013 | A | Apt 1B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 11, 2013 |
| Aug 8, 2013 | B | Apt 1B · § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 12, 2013 |
| Aug 8, 2013 | B | Apt 1B · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AND ALL WALLS IN THE 3rd ROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 12, 2013 |
| Aug 8, 2013 | B | Apt 1B · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 12, 2013 |
| Jul 1, 2008 | B | § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE STAIRS HAND RAIL,PUBLIC HALL , 2nd STORY | Aug 5, 2008 |
| Jun 23, 2008 | A | Apt 3 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE TILES AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 26, 2008 |
| Jun 23, 2008 | B | Apt 3 · § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS BATHTUB, IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 28, 2008 |
| Jun 23, 2008 | A | Apt 3 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR IN THE KITCHEN LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 26, 2008 |
| Jun 23, 2008 | B | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING PUBLIC HALL , 3rd STORY | Jul 28, 2008 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 8:15 PM ET. BBL 1021140025.