Staten Island · Block 751 · Lot 9 · 10314

535 North Gannon Avenue

2 floors · 11,352 sq ft · built 1981 · class H3 · owner of record: Victory Hospitality, Llc

0open violations
$2,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
773dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 42 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 773 days
Next cycle year 2028

Open violations

ECB / OATH (1) · $2,500 owed
IssuedViolationHearingBalance
Aug 14, 2026Construction CLASS - 1
AT THE TIME OF INSPECTION PVC WAS BEING USED FOR DRAINAGE FOR THE LAUNDRY ROOM WASHING MACHINES ALSO CONDENSATION LINE WAS TAPPED / INSTALLED INTO THE COPPER LINE WHICH IS CONTRARY TO PC 701.9, REPAIR AND/REPLA
#39200615X
Nov 4, 2026
IN VIOLATION
$2,500
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Aug 14, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED EXCESSIVE STORAGE IN MECHANICAL ROOMS. (BOXES, TVS, CLEANING PRODUCTS) POTENTIAL FIRE HAZARD., REPAIR AND/REPLACEClosed
Aug 14, 2026ECBConstruction: AT THE TIME OF INSPECTION OBSERVED IN THE HALLWAY GOING TO THE SECOND SIDE OF THE BUILDING THAT HAS THE ICE MAKER AND ATM NO SPRINKLER COVERAGE IN THE FIRST PART OF THE HALLWAY CONTRARY TO BC 903.3.3, REPAIR ANClosed
Aug 14, 2026ECBConstruction: AT THE TIME OF INSPECTION PVC WAS BEING USED FOR DRAINAGE FOR THE LAUNDRY ROOM WASHING MACHINES ALSO CONDENSATION LINE WAS TAPPED / INSTALLED INTO THE COPPER LINE WHICH IS CONTRARY TO PC 701.9, REPAIR AND/REPLAClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 19, 2026, 7:56 AM ET. BBL 5007510009.