3 floors · 123,804 sq ft · built 1963 · class W1 · owner of record: Nyc Department Of Parks And Recreation
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 123,804 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 433 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 15772). Agency page | Dec 31, 2032 in 2260 days | Next due 2032 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-12 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 31, 2026 | Construction CLASS - 2 REISSUE ECB #35692066K. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED: AT EXIT #7 AND EXIT #9 AROUND DOORWAY. CRACKS AND SPALLING PLASTER AT INTERIOR WALLS. REMEDY: REPAIR AND/OR REPLACE. #35727382J | Apr 20, 2026 POP/IN-VIO | $0 |
| Mar 31, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: EMERGENCY LIGHT #27 BY EXIT #8 NOT WORKING. REMEDY: REPAIR/REPLA #35727385P | Apr 20, 2026 POP/IN-VIO | $0 |
| Mar 31, 2026 | Construction CLASS - 2 REISSUE ECB #35692064R. EXIT DOOR NOT SELF-CLOSING. NOTED: EXIT DOORS #2, 3, 13 NOT OPERATING PROPERLY. REMEDY: REPAIR/REPLACE DOOR. #35727383L | Apr 20, 2026 POP/IN-VIO | $0 |
| Mar 31, 2026 | Construction CLASS - 2 REISSUE ECB #35692063P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED: SIMPLE DOORS NOT OPERATING PROPERLY AT: 2ND FLOOR CORRIDOR BY ROOM 202, 1ST FLOOR GYM, AUDITORIUM AND BY EXIT #283, 3RD FLOOR #35727384N | Apr 20, 2026 POP/IN-VIO | $0 |
| Mar 27, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT 2 FLOOR CORRIDOR BY 202, 1FL. GYM ENTRANCE AND STAGE RIGHT DOORS ARE NOT OPERATING PROPERLY. REMEDY: REPAIR AND/OR REPLACE. #35692063P | Apr 23, 2025 POP/IN-VIO | $0 |
| Mar 27, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT EXIT 9AROUND DOORWAY CRACKS AND SPALLING AT INTERIOR WALLS. REMEDY: REPAIR AND/OR REPLACE. #35692066K | Apr 23, 2025 POP/IN-VIO | $0 |
| Mar 27, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. NOTED AT 3 FLOOR SMOKE STAIR B AND C, 2 FLOORS(5) B, C, 1F(5) C. D. AND EXITS 2, 3, 7, 8, 9, 10 AND 12 DOORS ARENOT OPERATING PROPERLY. KITCHEN ENTRANCE. #35692064R | Apr 23, 2025 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| May 20, 2019 | Elevators EVCAT5 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 10:11 AM ET. BBL 4157720031.