3 floors · 2 apartments · 4,160 sq ft · built 1920 · class S2 · owner of record: Leung, Clre Wai Kwan
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 309 days | Required only if the owner doesn't live there |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1161 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-26 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 1, 2026 | Construction CLASS - 1 STOP ALL WORK AT REAR OF BUILDING. I OBSERVED WORK BEING PERFORMED ON 07/01/2026 APPROXIMATELY 3:30PM AT REAR OF STRUCTURE. UPON FURTHER RESEARCH FOUND THAT PERMIT WAS EXPIRED AS OF 06/28/2026. IN DIRECT VIOLAT #39556113N | Sep 9, 2026 DEFAULT | $2,530 |
| Issued | Violation | Status |
|---|---|---|
| Jul 30, 2001 | CONSTRUCTION W/O A PERMIT NOTED:ON 2ND FL REAR APT RENOVATION NEW SUSPENDED CEILING 2X3 STUDDED WALLS NEW SHEETROCK IN KITCHEN AND BATHROOM NEW PLUMBING IN HALLWAY NEW WALLS LEADING FROM 1ST TO 2ND FL IN REAR YARD A WOOD SHED APPROX 25'X15' WIDE X 12'HIGH IS ERECTED WITHOUT SHIGLES ON TOP ALL W/O PERMIT REMEDY:S #07CF02 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 9, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 6, 2009 | B | Apt 3FL · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK .. IN THE 1st LIVING ROOM FROM NORTH AT WEST LOCATED AT APT 3FL, 3rd STORY | Sep 10, 2009 |
| Aug 6, 2009 | A | Apt 3FL · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE 1st LIVING ROOM FROM NORTH AT WEST LOCATED AT APT 3FL, 3rd STORY | Nov 9, 2009 |
| Aug 6, 2009 | B | Apt 3FL · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOWER WINDOW SASHES IN THE 1st LIVING ROOM FROM NORTH AT WEST LOCATED AT APT 3FL, 3rd STORY | Sep 10, 2009 |
| Aug 6, 2009 | B | Apt 3FL · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOWER WINDOW SASH IN THE 1st BEDROOM FROM EAST LOCATED AT APT 3FL, 3rd STORY | Sep 10, 2009 |
| Aug 6, 2009 | B | Apt 3FL · HMC ADM CODE: § 27-2018.4 ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3FL, 3rd STORY | Sep 10, 2009 |
| Aug 6, 2009 | A | Apt 3FL · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 3FL, 3rd STORY | Nov 9, 2009 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 9, 2026 | DOB Safety | AEUHAZ: | Open |
| Jul 1, 2026 | ECB | Construction: STOP ALL WORK AT REAR OF BUILDING. I OBSERVED WORK BEING PERFORMED ON 07/01/2026 APPROXIMATELY 3:30PM AT REAR OF STRUCTURE. UPON FURTHER RESEARCH FOUND THAT PERMIT WAS EXPIRED AS OF 06/28/2026. IN DIRECT VIOLAT | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 9:48 AM ET. BBL 3008170042.