4 floors · 8 apartments · 8,419 sq ft · built 1927 · class C7 · owner of record: Kwok & Shao Realty Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1162 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-02 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 9, 2022 | C | Apt 4F · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Dec 3, 2022 |
| Nov 7, 2022 | A | Apt 4E · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPRX 8 SQ, FT. IN THE BATHROOM LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 10, 2023 |
| Apr 25, 2022 | B | Apt 2F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS IN THE 2nd ROOM FROM EAST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | May 30, 2022 |
| Apr 25, 2022 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MORTAR JOINTS AT BRICKS EXTERIOR WEST WALL AT EAST COURT | May 30, 2022 |
| Apr 25, 2022 | B | Apt 2F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE METAL CEILING IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | May 30, 2022 |
| Apr 25, 2022 | C | Apt 2F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR OVER CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | May 1, 2022 |
| Apr 25, 2022 | C | Apt 2F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | May 1, 2022 |
| Apr 25, 2022 | B | Apt 2F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | May 30, 2022 |
| Apr 25, 2022 | B | Apt 2F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | May 30, 2022 |
| Apr 25, 2022 | B | Apt 2F · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE MARBLE SADDLE AT ENTRANCE IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | May 30, 2022 |
| Apr 25, 2022 | A | Apt 2F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 29, 2022 |
| Apr 25, 2022 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MORTAR JOINTS AT BRICKS EXTERIOR EAST WALL AT EAST COURT | May 30, 2022 |
| Apr 25, 2022 | B | Apt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS IN THE 2nd ROOM FROM EAST LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | May 30, 2022 |
| Apr 25, 2022 | C | Apt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | May 1, 2022 |
| Apr 25, 2022 | A | Apt 2R · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION PLYWOOD AT ALL WALLS CREATING WALL DECOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 29, 2022 |
| Apr 25, 2022 | B | Apt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | May 30, 2022 |
| Apr 25, 2022 | B | Apt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | May 30, 2022 |
| Apr 25, 2022 | C | Apt 2R · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CERAMIC TILES AT ALL WALLS IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | May 1, 2022 |
| Apr 25, 2022 | B | Apt 2R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | May 30, 2022 |
| Apr 25, 2022 | C | Apt 2R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FLOOR TILES OPEN AROUND STEAM RISER IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | May 1, 2022 |
| Apr 25, 2022 | B | Apt 2F · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | May 30, 2022 |
| Apr 25, 2022 | B | Apt 2F · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | May 30, 2022 |
| Apr 25, 2022 | B | Apt 2F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE METALIC CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | May 30, 2022 |
| Apr 25, 2022 | A | Apt 2F · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION METALIC CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 29, 2022 |
| Apr 25, 2022 | B | Apt 2F · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOUSE FURNITURE OBSTRUCTING WINDOW LEADING TO FIRE ESCAPE IN THE 2nd ROOM FROM EAST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | May 30, 2022 |
| Apr 25, 2022 | C | Apt 2F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FLOORING OR VINYL FLOOR TILES IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | May 1, 2022 |
| May 5, 2021 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. | Aug 8, 2021 |
| Apr 16, 2021 | C | Apt 4F · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Apr 20, 2021 |
| Mar 19, 2020 | A | Apt 3R · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WOOD PANELS AT ALL WALLS IN FOYER, 2ND ROOM FROM NORTH AT WEST AND 2ND ROOM FROM NORTH AT EAST LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT | Jun 22, 2020 |
| Mar 19, 2020 | B | Apt 3R · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 23, 2020 |
| May 8, 2017 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Aug 11, 2017 |
| Aug 2, 1994 | B | Apt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS BATHROOM 2 STY EAST APT 2R , SECTION '' '' | Sep 19, 1994 |
| Aug 2, 1994 | B | Apt 2R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR BATHROOM 2 STY EAST APT 2R , SECTION '' '' | Sep 19, 1994 |
| Aug 2, 1994 | A | Apt 2R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS THRU OUT 2 STY REAR APT 2R , SECTION '' '' | Nov 18, 1994 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 4:19 PM ET. BBL 3008160009.