Manhattan · Block 1233 · Lot 7501 · 10024

530 West End Avenue

12 floors · 39 apartments · 60,292 sq ft · built 1912 · class RM · owner of record: The Sexton Condominium Inc

16open violations
$0ECB/OATH penalties owed
4HPD class C (immediately hazardous)
44dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 44 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 60 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 60,292 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 165 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 165 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 288 days
Registered through 2027-09-01
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $36,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2029
in 827 days
Filing window not open yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1140 days
Next cycle year 2029
Energy audit and retro-commissioning (2033) Likely applies
Local Law 87 · Calendar year 2033
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1233). Agency page

Dec 31, 2033
in 2601 days
Next due 2033
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-03 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Jan 16, 2024Local Law CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #903897. REMEDY: FILE ACCEPTABLE REPORT.
#37026356R
May 9, 2024
IN VIOLATION
$0
May 19, 1999Local Law Non-Hazardous
FAILURE TO FILE A REPORT OF COMPLIANCE W/ LL 16/84-CERTIFYING TO THE INSTALLATION OF REQUIRED FIRE PROTECTION SYSTEMS. REMEDY: FILE REPORT.
#34176840N
Jul 8, 1999
WRITTEN OFF
$0
DOB (2)
IssuedViolationStatus
Jul 27, 2023HAZARDOUS CONDITION (FACADE)
CYCLE 9C UNSAFE REPORT FILED
#911198
DOB VIOLATION - ACTIVE
Jul 23, 2023FAILURE TO CORRECT SWARMP CONDITIONS (FACADE)
CYCLE 9C FAILURE TO CORRECT SWARMP CONDITIONS
#00654
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Jul 27, 2023Facades FISPHAZ
CYCLE 9C UNSAFE REPORT FILED
Active
Jul 23, 2023Facades FISPFCS
CYCLE 9C FAILURE TO CORRECT SWARMP CONDITIONS
Active
Jan 3, 2017Elevators ACC1
Active
HPD (9) · C 4 · B 5 · A 0
IssuedClassViolationCorrect by
Mar 13, 2026CApt GR2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH COUNTER BALANCE AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT GR2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHMar 19, 2026
Dec 8, 2025BApt GR2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCES AT LOWER SASH OF WINDOW AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT GR2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHJan 12, 2026
Dec 5, 2025BApt 284 · § 27-2005 HMC: REFIT LOWER WINDOW SASH AT THE NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 284, 1st APARTMENT FROM EAST AT SOUTHJan 9, 2026
Oct 15, 2025CApt 284 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH AT THE NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT BSMT-APT 284, 1st BSMT-APT FROM EAST AT SOUTH , SECTION ''86STREET''Oct 21, 2025
Mar 26, 2025CApt GR2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT GR2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHApr 1, 2025
Mar 10, 2025CApt GR2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH KEEPS FALLING OUT OF WINDOW FRAME IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT GR2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHMar 16, 2025
Jan 13, 2025BApt GR2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SASH LOCK AT LOWER WINDOW SASH AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT GR2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''86Street''Feb 17, 2025
Nov 12, 2024BApt GR2 · § 27-2005 HMC: REFIT LOWER SASH WINODOW AT NORTH IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT GR2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHDec 17, 2024
Feb 12, 2024BApt GR2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE LOWER SASH FIRST WINDOW FROM WEST AT NORTH IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT GR2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHMar 18, 2024

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 8:11 PM ET. BBL 1012337501.

Look up another building