Brooklyn · Block 5400 · Lot 91 · 11218

525 Ocean Parkway

6 floors · 62 apartments · 62,226 sq ft · built 1963 · class D4 · owner of record: Parkway House Rlty Assoc

15open violations
$625ECB/OATH penalties owed
3HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 65 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 81 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 62,226 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 186 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 186 days
Annual filing
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 430 days
Next cycle year 2027
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5400). Agency page

Dec 31, 2030
in 1526 days
Next due 2030
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-20 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1) · $625 owed
IssuedViolationHearingBalance
Apr 11, 2024Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.1 FOR CONTROL #916481. REMEDY: SUBMIT ACCEPTABLE REQU
#37028064Y
Nov 6, 2024
IN VIOLATION
$625
DOB (4)
IssuedViolationStatus
Feb 22, 2023NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
#00917
DOB VIOLATION - ACTIVE
Feb 9, 2018FACADE SAFETY PROGRAM

#HAZ81648
DOB VIOLATION - ACTIVE
Jan 6, 2006LOCAL LAW 62/91 - BOILERS

#10756
DOB VIOLATION - ACTIVE
Jan 31, 2005LOCAL LAW 62/91 - BOILERS

#11620
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Feb 22, 2023Facades FISPNRF
CYCLE 9B NO REPORT FILED
Active
Feb 9, 2018Facades FISP
CYCLE 8B UNSAFE REPORT FILED
Active
Jan 6, 2006Boiler LL6291
Active
Jan 31, 2005Boiler LL6291
Active
HPD (6) · C 3 · B 3 · A 0
IssuedClassViolationCorrect by
Dec 19, 2023BApt 4F · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL. APPROX 4 SQ.FT IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 16173811 ISSUED 19-AUG-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017Jan 23, 2024
Sep 8, 2023BApt 1A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 6 SQUARE FEET AT CEILING IN THE BATHROOM LOCATED AT APT 1A, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 15973089 ISSUED 10-MAY-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODEOct 13, 2023
Jun 21, 2023BApt 1A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPRX 3 SQUARE FEET IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 15730212 ISSUED 18-FEB-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-201Jul 26, 2023
Jun 5, 2019CApt 4B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT EAST WALL APPROX. 20 SQ.FT AND NORTH WALL APPROX. 20 SQ.FT IN THE 2nd ROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 3rd APARTMENT FROM SOUTH AT WESTJun 26, 2019
Nov 1, 2018CApt 4J · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING, WEST WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTHNov 29, 2018
Nov 1, 2018CApt 4J · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING, WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTHNov 29, 2018

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 27, 2026, 7:21 AM ET. BBL 3054000091.

Look up another building