5 floors · 83,942 sq ft · built 1920 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 48 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 83,942 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 169 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 169 days | Annual filing |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2177). Agency page | Dec 31, 2027 in 413 days | Next due 2027 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 779 days | Next cycle year 2028 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-03 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 29, 2026 | Construction CLASS - 2 REISSUE:35717432J DATE OF ISSUE:04.22.2025 EXIT DOOR NOT SELF-CLOSING PROPERLY AT THE TIME OF INSPECTION AT FIRST FLOOR AUDITORIUM NEAR STAGE TWO MAIN EXIT DOORS EXIT-7 AND EXIT 6,TWO OUTSIDE MAIN EXIT NOT SELF #35731809L | Jul 15, 2026 POP/IN-VIO | $0 |
| May 29, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.AT THETIME OF INSPECTION OBSERVED AND NOTED AT 3RD FL STAIRWAY E 1 EMER EXIT #35731812M | Jul 15, 2026 POP/IN-VIO | $0 |
| May 29, 2026 | Construction CLASS - 2 REISSUE:35717431H DATE OF ISSUE:04.22.2025 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED AND NOTED 5TH FLOOR ROOM-519 AND WILSON STREET SIDE ALL ROOMS THROUGHOUT HAS W #35731810Z | Jul 15, 2026 POP/IN-VIO | $0 |
| May 29, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED AND NOTED FOR DIFECTIVE HARDWARE DOOR CLOSURE OR DIFECTIVE HINGE DOORS ARE NOT CLOSING PROPERLY AT 1ST FL AUDITORIUM 2 EX #35731811K | Jul 15, 2026 POP/IN-VIO | $0 |
| Apr 22, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. EXIT DOOR THROUGHOUT CORRIDORS NOT SELF-CLOSING. REMEDY: COMPLY WITH CODE. #35717432J | Jun 12, 2025 POP/IN-VIO | $0 |
| Apr 22, 2025 | Construction CLASS - 2 REISSUE: 35679050J-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: 5TH FLOOR CLASSROOM THROUGHOUT HAS WATER DAMAGE TO CEILINGS. REMEDY: COMPLY WITH CODE. #35717431H | Jun 12, 2025 POP/IN-VIO | $0 |
| Apr 3, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.5TH FLOOR CLASSROOMS THROUGHOUT HAS WATER DAMAGE TO CEILINGS.REM:COMPLY WITH CODE. #35679050J | May 3, 2024 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Mar 24, 2020 | CONSTRUCTION BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT#302585067 DUE TO CONSTRUCTION SUPERINTENDANT WITHDRAWAL. #20-00630 | DOB VIOLATION - ACTIVE |
| Mar 24, 2020 | CONSTRUCTION BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT# 302585067 DUE TO SUPERINTENDANT WITHDRAWAL. #20-00631 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 13, 2026, 6:28 PM ET. BBL 3021770001.