Brooklyn · Block 5981 · Lot 71 · 11209

525 80 Street

3 floors · 4 apartments · 4,335 sq ft · built 1920 · class C3 · owner of record: Hiliaris, Kiriakos

4open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
68dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 68 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 84 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 312 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 799 days
Next cycle year 2028

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Dec 19, 2024Construction CLASS - 2
ATOI OBSERVED AT EXPOSURE 3 CINDER BLOCK/CHAIN LINK FENCE THAT IS 25 FEET LONG AND 7 FEET 5 INCHES TALL. PERMIT REQUIRED FOR FENCES OVER 6 FEET, NO PERMIT ON FILE WITH DOB., OBTAIN ALL PERMITS
#39133394Y
Feb 26, 2025
DEFAULT
$0
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (3) · C 0 · B 3 · A 0
IssuedClassViolationCorrect by
Jun 6, 2024B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES CONSISTING OF AIR CONDITIONER PROTRUDING MORE THAN 4 1/2'' PAST WINDOW SILL AT STACK AT EAST AT REAR OF BUILDING AT FIRE ESCAPE, 2nd STORYJul 11, 2024
Jun 6, 2024B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES CONSISTING OF FLOWER POTS AT STACK AT EAST AT BUILDING REAR AT FIRE ESCAPE, 3rd STORYJul 11, 2024
Apr 14, 2014BSECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING A MINIMUM OF 100 WATTS OF INCANDESCENT LIGHT REQUIRED. (LIGHT FIXTURE PRESENT)May 19, 2014

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 9:32 PM ET. BBL 3059810071.

Look up another building