Manhattan · Block 694 · Lot 47 · 10011

524 West 23 Street

10 floors · 141,934 sq ft · built 1931 · class E7 · owner of record: Sm I Mms, L.L.C.

12open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
46dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 46 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page

Feb 21, 2027
in 98 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 141,934 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 167 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 167 days
Annual filing
Energy audit and retro-commissioning (2034) Likely applies
Local Law 87 · Calendar year 2034
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 694). Agency page

Dec 31, 2034
in 2968 days
Next due 2034
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-07 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (3)
IssuedViolationHearingBalance
Jun 13, 2013Signs CLASS - 1
OUTDOOR ADVERTISING COMPANY SIGN ON DISPLAY W/O A PERMIT. (THERE ARE OTHER WAYS TO DRY,ETC) REMEDY: REMOVE ILLEGAL SIGN.
#35027130X
Mar 21, 2014
IN VIOLATION
$0
Jun 13, 2013Signs CLASS - 1
OUTDOOR ADVERTISING COMPANY SIGN ON DISPLAY W/O A PERMIT. (MOMA) REMEDY: REMOVE ILLEGAL SIGN.
#35027129Z
Mar 21, 2014
IN VIOLATION
$0
Feb 22, 2010Construction CLASS - 2
ALTERED/CHANGED BUILDING OCCUPIED W/O A VALID C OF O AS PER 28-118.3.1 28-118.3.2 NOTED: THE FOLLOWING CONDITIONS. EXISTING C OF O DATED DATED 6/17/88 INDICATES OFFICES ON THE 2,3 & 4TH FLRS THESE FLR ARE PUBLI
#34829038L
Apr 15, 2010
STIPULATION/IN-VIO
$0
DOB (4)
IssuedViolationStatus
Jun 5, 2009ELEVATOR

#302494/9444
DOB VIOLATION - ACTIVE
Mar 3, 2007CONSTRUCTION

#SGSTF02SC
DOB VIOLATION - ACTIVE
Aug 18, 2005ELEVATOR

#94441138351
DOB VIOLATION - ACTIVE
Feb 1, 2001ELEVATOR
1P6798
#9011/133054
DOB VIOLATION - ACTIVE
DOB NOW Safety (5)
IssuedViolationStatus
Nov 25, 2024Parking Structures FTF-PS-INITL
Failure to file sub cycle 1A compliance report by 12/31/2023
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 8:08 PM ET. BBL 1006940047.

Look up another building