5 floors · 24 apartments · 15,370 sq ft · built 1905 · class C1 · owner of record: 524 West 134th St Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 44 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-07-01 (Accepted). Agency page | Dec 31, 2026 in 44 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Registered through 2027-09-01 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 8, 2025 | Site Safety CLASS - 1 AT A ACTIVE 5 STORY BUILDING UNDER FULL INTERIOR ALTERATION JOBSITE.I NOTICED THAT APPROX.50-75 OF INTERIOR OF BUILDING HAS BEEN DEMOED AND ALTERED.FAILURE TO DESIGNATE AND/OR HAVE A CONSTRUCTION SUPERINTENDENT #39538861J | Mar 29, 2027 | $12,500 |
| Mar 11, 2025 | Construction CLASS - 1 NOTE: ATOI OF A 5-STORY BUILDING IT WAS OBSERVED THAT SEVERAL WINDOWS &WALLS WHICH WAS UNDER A FULL STOP WORK ORDER, SINCE-02/02/2025.BY BADGE:#2868- VIO-# 39137778L UPON INSPECTION PERFORMED IT REVELED FAILURE #39141073N | Jan 28, 2027 | $10,000 |
| Jun 16, 2014 | Construction CLASS - 1 27-127 FAIL TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.DEFECT NOTED-THERETAINING WALL(RETAIN SIDE WALK)IS BULGING & LOOSE BRICK WORK THRU OUT.LOC-EAST SIDE OF BLDG @ CELLAR ENTRANCE FROM SIDEWALK.REM: #35074250M | Sep 4, 2014 WRITTEN OFF | $0 |
| Jun 25, 2013 | Construction CLASS - 1 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE DOB OR C/O I-CARDS. ILLEGAL CLASS 'A' APT CREATED AT CELLAR. REMEDY: DISCONTINUE ILLEGAL USE OR AMEND C/O. #34746399N | Oct 1, 2013 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Oct 28, 2013 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00074 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
| Oct 28, 2013 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Dec 2, 2021 | B | Apt 43 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX 10 SQ.FT IN THE BATHROOM LOCATED AT APT 43, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jan 6, 2022 |
| Mar 5, 2021 | C | Apt 33 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX.10 SQ. FT AND WEST WALL APPROX 5 SQ FT IN THE BATHROOM LOCATED AT APT 33, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 13108705 ISSUED 05-JUN-19 HAS BEEN UPGRADED TO CLASS C PER A | Mar 31, 2021 |
| Mar 5, 2021 | C | Apt 33 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 4 SQ FT AT CEILING AND 8 SQ FT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 33, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 13072163 ISSUED 15-MAY-19 HAS BEEN UPGRADED TO CLASS C PER ADMINISTRATIV | Mar 31, 2021 |
| Mar 5, 2021 | C | Apt 33 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APROX 6 SQ FT AT CEILING, 6 SQ FT AT NORTH WALL, 4 SQ FT AT EAST WALL IN THE BATHROOM LOCATED AT APT 33, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 13112732 ISSUED 07-JUN-19 HAS BEEN UPGRADED TO | Mar 31, 2021 |
| Jan 18, 2019 | B | Apt 33 · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... APROX 4 SQ FT AT CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 33, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 22, 2019 |
| Aug 20, 2018 | B | Apt B · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 24, 2018 |
| Mar 30, 2015 | C | Apt 54 · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE ENTIRE APARTMENT LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 7, 2015 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 4:37 AM ET. BBL 1019870053.