Manhattan · Block 2130 · Lot 39 · 10033

522 West 174 Street

5 floors · 16 apartments · 12,710 sq ft · built 1907 · class C1 · owner of record: Nyc Housing Preservation And Development

166open violations
$0ECB/OATH penalties owed
24HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 50 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 66 days
Annual
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 415 days
Next cycle year 2027
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-30 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
May 7, 2021Boilers CLASS - 2
FOUND HOLES ON WALLS AND CEILING, DAR KIT MISSING AT FUEL PUMP, EXPOSED WIRING, GLASS GAUGE GUARDS MISSING, DISCHARGE PIPE ON RELIEF VALVE NOT PROPERLY SUPPORTED, BODY DRAIN ALSO MISSING ON RELIEF VALVE, BOILER
#39040791P
May 10, 2021
POP/IN-VIO
$0
Mar 14, 2019Boilers CLASS - 2
B254, 25A, 32A, 31B
#32098867J
Jun 13, 2019
POP/IN-VIO
$0
DOB (0)

None open.

DOB NOW Safety (5)
IssuedViolationStatus
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 12)
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
HPD (159) · C 24 · B 85 · A 50
IssuedClassViolationCorrect by
Jan 27, 2011BApt 7 · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 7, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTMar 3, 2011
Jan 27, 2011CApt 7 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC AND SHEETROCK WALL AT EAST IN THE BATHROOM LOCATED AT APT 7, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTFeb 2, 2011
Jan 27, 2011BApt 7 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 7, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTMar 3, 2011
Jan 27, 2011CApt 7 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE STEAM VALVE AT RADIATOR IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 7, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTFeb 2, 2011
Jan 27, 2011CApt 7 · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WATER SUPPLY LINES AT EAST WALL IN THE BATHROOM LOCATED AT APT 7, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTFeb 2, 2011
Jan 27, 2011BApt 7 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 7, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTMar 3, 2011
Jan 27, 2011CApt 7 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE STEAM VALVE AT RADIATOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 7, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTFeb 2, 2011
Jan 27, 2011BApt 7 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SUBFLOORING BY RADAITOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 7, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTMar 3, 2011
Jun 4, 2010BApt 5 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 5th ROOM FROM NORTH AT WEST LOCATED AT APT 5 , 2nd STORY, 5th APARTMENT FROM SOUTH AT WESTJul 9, 2010
Jun 4, 2010CApt 5 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR APPROX 10 SQ FT CEILING BULGE IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 5 , 2nd STORY, 5th APARTMENT FROM SOUTH AT WESTJun 10, 2010
Jun 4, 2010BApt 5 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE UPPER SASH WINDOW IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5 , 2nd STORY, 5th APARTMENT FROM SOUTH AT WESTJul 9, 2010
Jun 4, 2010BApt 5 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE REFRIGERATOR DOOR GASKET IN THE KITCHEN LOCATED AT APT 5 , 2nd STORY, 5th APARTMENT FROM SOUTH AT WESTJul 9, 2010
Jun 4, 2010BApt 12 · § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE SHOWER BODY IN THE BATHROOM LOCATED AT APT 12 , 4th STORY, 1st APARTMENT FROM NORTH AT EASTJul 9, 2010
Jun 4, 2010CApt 12 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES (CUT HAZZARD) IN THE BATHROOM LOCATED AT APT 12 , 4th STORY, 1st APARTMENT FROM NORTH AT EASTJun 10, 2010
Jun 4, 2010CApt 5 · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT WASTELINE BENEATH SINK IN THE KITCHEN LOCATED AT APT 5 , 2nd STORY, 5th APARTMENT FROM SOUTH AT WESTJun 10, 2010
Dec 11, 2008AApt 9 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, NORTH WALL, SOUTH WALL, EAST WALL, WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 9, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHMar 16, 2009
Dec 11, 2008AApt 9 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, NORTH WALL, SOUTH WALL, EAST WALL, WEST WALL IN THE 6th ROOM FROM NORTH LOCATED AT APT 9, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHMar 16, 2009
Dec 11, 2008AApt 9 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, NORTH WALL, SOUTH WALL, EAST WALL, WEST WALL IN THE 5th ROOM FROM NORTH LOCATED AT APT 9, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHMar 16, 2009
Dec 11, 2008AApt 9 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, NORTH WALL, SOUTH WALL, EAST WALL, WEST WALL IN THE KITCHEN LOCATED AT APT 9, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHMar 16, 2009
Dec 11, 2008AApt 9 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM WEST AT NORTH WALL, SOUTH WALL, EAST WALL, WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 9, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHMar 16, 2009
Dec 11, 2008AApt 9 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, SOUTH WALL, EAST WALL, WEST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 9, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHMar 16, 2009
Dec 11, 2008AApt 9 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, NORTH WALL, SOUTH WALL, EAST WALL, WEST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 9, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHMar 16, 2009
Dec 11, 2008AApt 9 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, NORTH WALL, SOUTH WALL, EAST WALL, WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 9, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHMar 16, 2009
Sep 25, 2008BApt 9 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING AT ENTIRE APARTMENT, 3rd STORY, APARTMENTOct 30, 2008
Sep 25, 2008BApt 9 · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASHBASIN DETACHED FROM WALL IN THE BATHROOM LOCATED AT APT 9, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHOct 30, 2008
Jul 28, 2006AApt 15 · D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SASH POCKET 4 STY SOUTHEAST APT 15 FRONT ROOM. LOCATED AT APT 15Nov 12, 2006
Jul 28, 2006AD26-11.01, 11.03, 11.05 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE EASR COURT.Nov 12, 2006
Jul 28, 2006AApt 8 · D26-12.01 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS & CLGS 3 STY FRNT WEST APT 8 ENTIRE APT , SECTION '' ''Nov 12, 2006
Jul 28, 2006A§ 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER 1 STY FRONT FIRE ESCAPE.Nov 12, 2006
Jul 28, 2006AApt 10 · D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CLG 4 STY REAR APT 10 2ND ROOM FROM REAR AT EAST AT STEAM PIPE RISER. , SECTION '' ''Nov 12, 2006
Jul 28, 2006AApt 10 · D26-10.01 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE MARBLE SADDLE 4 STY REAR APT 10 AT ENTRANCE DOOR. , SECTION '' ''Nov 12, 2006
Jul 28, 2006AD26-10.01 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK & MORTOR CHIMNEY OF WEST COURT AT TOP.Nov 12, 2006
Jul 28, 2006AD26-22.03 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER.Nov 12, 2006
Jul 28, 2006AApt 10 · D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE AND OR MAKE OPERABLE 4 STY WEST APT 10 WEST WINDOW KITCHEN. LOCATED AT APT 10Nov 12, 2006
Jul 28, 2006AApt 1IA · D26-12.01 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CLG 5 STY WEST APT 1IA REAR WEST ROOM. LOCATED AT APT 1IANov 12, 2006
Jul 28, 2006AApt 10 · D26-10.01 ADM CODE PROPERLY SECURE THE LOOSE CLG LIGHT FIXTURE 4 STY NORTH WEST APT 10 KITCHEN AND REAR EAST ROOM. LOCATED AT APT 10Nov 12, 2006
Jul 28, 2006A§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING FRAME.Nov 12, 2006
Jul 28, 2006AApt 7 · D26-12.01 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS 3 STY NORTHWEST APT 7 THROUGHOUT. , SECTION '' ''Nov 12, 2006
Jul 28, 2006AApt 15 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS & CEILINGS 5 STY NORTH APT 15 THRU OUT,. , SECTION '' ''Nov 12, 2006
Jul 28, 2006AApt 5 · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS KITCHEN SINK 2 STY FRONT WEST APT 5. , SECTION '' ''Nov 12, 2006
Jul 28, 2006AApt 1 · § 27-2005 ADM CODE REFIT ENTRANCE DOOR 1 STY FRONT EAST APT 1. LOCATED AT APT 1Nov 12, 2006
Jul 28, 2006AApt 15 · D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING OF SOUTH ROOM AND 2ND ROOM FROM SOUTH AT 5TH STY FRONT EAST APT 15. LOCATED AT APT 15Nov 12, 2006
Jul 28, 2006AApt 15 · D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PARTING STRIPS OF WINDOWS THROUGHOUT 5TH STY FRONT EAST APT 15. LOCATED AT APT 15Nov 12, 2006
Jul 28, 2006AApt 15 · D26-10.01 ADM CODE REPLACE WITH NEW THE MISSING WINDOW CHAINS AT WEST WINDOW OF NORTHWEST ROOM AT 5TH STY FRONT EAST APT 15. LOCATED AT APT 15Nov 12, 2006
Jul 28, 2006AApt 5 · D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERABLE TOP AND BOTTOM SASHES OF WINDOW IN NORTHWEST ROOM AT 2ND STY FRONT WEST APT 5. , SECTION '' ''Nov 12, 2006
Jul 28, 2006AApt 15 · D26-12.01 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS 4 STY SOUTHWEST APT 15 KITCHEN AND BATHROOM 2ND ROOM FROM REAR AND REAR ROOM. LOCATED AT APT 15Nov 12, 2006
Jul 28, 2006AApt 5 · D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING 2 STY SOUTHWEST APT 5 PRIVATE HALL. LOCATED AT APT 5Nov 12, 2006
Jul 28, 2006AApt 15 · D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALL UNDER WASHBASIN 4 STY SOUTHEAST APT 15 BATHROOM. LOCATED AT APT 15Nov 12, 2006
Jul 28, 2006AApt 15 · D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING 4 STY SOUTHWEST APT 15 KITCHEN. LOCATED AT APT 15Nov 12, 2006
Jul 28, 2006AApt 15 · D26-10.01 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE BOTTOM SASH 4TH STY SOUTHEAST APT 15 FRONT ROOM WEST WINDOW. LOCATED AT APT 15Nov 12, 2006
Jul 28, 2006AApt 15 · D26-10.01 ADM CODE REFIT BOTTOM AND UPPER SASHES 4 STY SOUTHEAST APT 15 THROUGHOUT. LOCATED AT APT 15Nov 12, 2006
Jul 28, 2006AApt 15 · D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WOOD FLOOR 4 STY SOUTHWEST APT 15 KITCHEN. LOCATED AT APT 15Nov 12, 2006
Jul 28, 2006AApt 15 · D26-10.01 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE INTERIOR WINDOW SILLS 4 STY SOUTHEAST APT 15 THROUGHOUT. LOCATED AT APT 15Nov 12, 2006
Jul 28, 2006AApt 15 · D26-16.01 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS BATHTUB 4 STY FRONT EAST APT 15 BATHROOM. LOCATED AT APT 15Nov 12, 2006
Jul 28, 2006AApt 15 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS 5 STY NORTHEAST APT 15 THROUGHOUT. , SECTION '' ''Nov 12, 2006
Jul 28, 2006AApt 15 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS 3 STY SOUTH APT 15 ALL ROOMS. , SECTION '' ''Nov 12, 2006
Jul 28, 2006AApt 9 · D26-12.01 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS 3RD STY FRONT APT 9 2ND ROOM FROM REAR. , SECTION '' ''Nov 12, 2006
Jul 28, 2006AApt 7 · D26-10.01 ADM CODE REFIT ENTRANCE 3RD STY REAR APT 7 DOOR. LOCATED AT APT 7Nov 12, 2006
Jul 28, 2006A§ 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER REAR SOUTH.Nov 12, 2006
Jul 28, 2006AD26-10.01 ADM CODE REPLACE WITH NEW THE MISSING WOODEN HAND RAIL 4TH TO 5TH STY PUBLIC HALL STAIRS.Nov 12, 2006

Showing 60 of 159. Full list on the agency site.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 3:17 PM ET. BBL 1021300039.

Look up another building