Brooklyn · Block 1893 · Lot 60 · 11205

521 Myrtle Avenue

1 floors · 1,500 sq ft · built 1984 · class K1 · owner of record: Madhoun Llc

5open violations
$0ECB/OATH penalties owed
1HPD class C (immediately hazardous)
1157dto Gas piping inspection (2029 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 61 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1157 days
Next cycle year 2029

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Aug 9, 2013Unknown CLASS - 1
FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER,FAILURE TO PROVIDE# OF REQUIRED MEANS OF EGRESS FOR EVERY FLOOR,@ REAR YARD AN(ARRANGEMENT) OF APPROX 30 PERSONS W/O A 2ND MEANS OF EGRESS @ DIRECT IN SPECIFI
#35022197H
Sep 25, 2013
IN VIOLATION
$0
DOB (1)
IssuedViolationStatus
Jul 6, 2015CONSTRUCTION

#EX0201BT
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 2)
Active
HPD (2) · C 1 · B 1 · A 0
IssuedClassViolationCorrect by
Aug 13, 2008BSECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR BATHROOM 2ND STORY NORTH APARTMENT.Sep 17, 2008
Aug 13, 2008CSECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES KITCHEN AND BATHROOM, 2ND STORY NORTHWEST APT.Aug 19, 2008

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 31, 2026, 8:00 AM ET. BBL 3018930060.

Look up another building