2 floors · 3 apartments · 1,440 sq ft · built 1960 · class C0 · owner of record: Nyc Housing Preservation And Development
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-29 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 25, 2019 | Boilers CLASS - 2 GLASS GAUGE DIRTY, REPLACE GLASS GAUGE. HOLES IN CEILING , BOILER ROOM SHALL BE FIRE RATED. CORRODED PIPING ON BOTTOM OF BOILER AT HARFORD LOOP. REPLACE ALL CORRODED PIPING. BOILER ROOM DOOR NOT SELF CLOSING. R #39001751Z | Apr 2, 2019 POP/IN-VIO | $0 |
| Jan 30, 2017 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER. TOP STEP GOING FROM 1ST FLR TO 2ND FLR LOOSE AND POSES POTENTIAL TRIP/FALL HAZARD.RMDY: COMPL WITH SUMMONS. #35225782Z | Apr 7, 2017 POP/IN-VIO | $0 |
| Jan 30, 2017 | Construction CLASS - 1 FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASAGEWAY AT BASEMENT (GROUND FLOOR) EXIT DOOR HAS SLIDE PERMANENTLY STUCK IN LOCKED POSITION. AT TOP FLR (2ND) BUCKETS IN HALLWAY DIMINISHING HALLWAY WIDTH AND OBSTRUCTING #35225781R | Apr 7, 2017 POP/IN-VIO | $0 |
| Jan 30, 2017 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY BLDG DEPT RECORDS. 3STORY DWELLING USED AS CHURCH ON 2ND FLR, 3RD FLR USED AS 3/4 HOUSE AND 1ST FLR USED AS OFFICE AND STORAGE AREA. DEPT OF FINANCE RECORDS SHOW PROEPRTY #35225783K | Apr 7, 2017 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #05352 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #35125 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #15279 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #36048 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 9:20 PM ET. BBL 2022740012.