Manhattan · Block 459 · Lot 7502 · 10003

52 East 4 Street

15 floors · 14 apartments · 26,790 sq ft · built 2007 · class RM · owner of record: Unavailable Owner

18open violations
$500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
46dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 46 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 62 days
Annual
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $210,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 98 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 26,790 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 167 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 167 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 290 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 777 days
Next cycle year 2028

Open violations

ECB / OATH (3) · $500 owed
IssuedViolationHearingBalance
Jun 1, 2021Local Law CLASS - 2
FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE8A REPORT OF CRITICAL EXAM DOCUMENTING CONDITION OF EXTERIOR WALL&APPURTENANCES REQUIRED BY28-302.4 FOR CONTROL814103.SUBMIT ACCEPTABLE REQUIRED TECHNICAL REPORT
#37021650P
Mar 3, 2022
IN VIOLATION
$0
Mar 6, 2018Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BUILDING ROOF ELEV MACHINE ROOM CEPING NOT SECURED(EAST SIDE)ELEV MACHINE ROOM(WEST)EXTERIOR EIF NOT SEALED @ COPING WEST EXTERIOR PANAL DISLODGED.MASONRY FLOOR TILES CRACKED FLOOR
#35265146Y
Sep 20, 2018
IN VIOLATION
$500
Oct 12, 2006Construction Hazardous
FAILURE TO SAFEGUARD PUBLIC & PROPERTY AFFECTED BY CONSTRUCTION OPERATION. ON INSPECTION ADJ PROPERTY ON 4TH ST AT REAR HAS UNDERMINED APPROX 2' TO 3'DUE TO CONSTRUCTION OPERATIONS. APPROX 6' X 4' X 4'CEMENT
#34538894Y
Oct 30, 2008
WRITTEN OFF
$0
DOB (4)
IssuedViolationStatus
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#01756
DOB VIOLATION - ACTIVE
Sep 6, 2019(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
#07943
DOB VIOLATION - ACTIVE
Sep 6, 2019(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
#07944
DOB VIOLATION - ACTIVE
May 31, 2018NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
#01458
DOB VIOLATION - ACTIVE
DOB NOW Safety (11)
IssuedViolationStatus
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Feb 22, 2022Facades FISPNRF
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Active
Sep 6, 2019Elevators ACC1
Active
Sep 6, 2019Elevators ACC1
Active
May 31, 2018Facades FISPNRF
FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 4:52 AM ET. BBL 1004597502.

Look up another building