3 floors · 6 apartments · 5,208 sq ft · built 1924 · class C2 · owner of record: 52-09 Skillman Avenue Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 63 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 79 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 307 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1159 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-16 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 7, 2021 | Construction CLASS - 1 OBSERVED SEWAGE LEAKING AT THE BOTTOM OF REAR BASEMENT WALL OF 52-09 SKILLMAN AVENUE INTO RIGHT YARD OF 52-07 SKILLMAN AVENUE. THE SHARED WALL OF 2 BUILDINGS AT THE REAR OF BASEMENTS HAVE HOLES AND CRACKS AT TH #39038916R | May 9, 2023 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #15059 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #32979 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #12078 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #33475 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #19778 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #17170 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #19601 | DOB VIOLATION - ACTIVE |
| Mar 1, 2013 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT #13804 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| Mar 1, 2013 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 14, 2026 | B | Apt 1L · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MARBLE SADDLE AT FLOOR IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jun 18, 2026 |
| May 14, 2026 | B | Apt 1L · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING HEAT RISER PIPE ESCUTCHEON PLATE AT CEILING IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jun 18, 2026 |
| May 14, 2026 | B | Apt 1L · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jun 18, 2026 |
| May 14, 2026 | C | Apt 1L · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SUBFLOORING IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | May 20, 2026 |
| May 14, 2026 | B | Apt 1L · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTELINE AT WASH BASIN IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jun 18, 2026 |
| May 14, 2026 | B | Apt 1L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WASH BASIN BASE CABINET IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jun 18, 2026 |
| May 13, 2026 | B | Apt 1L · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jun 17, 2026 |
| May 13, 2026 | B | Apt 1L · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jun 17, 2026 |
| May 13, 2026 | C | Apt 1L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER SASH WINDOW GLASS PANE AT NORTH WALL IN THE KITCHEN LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | May 19, 2026 |
| May 13, 2026 | B | Apt 1L · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT WEST WALL IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jun 17, 2026 |
| May 13, 2026 | C | Apt 1L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH GLASS PANE AT 1 WINDOW FROM EAST AT SOUTH IN THE 5th ROOM FROM NORTH LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | May 19, 2026 |
| May 13, 2026 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Aug 16, 2026 |
| May 13, 2026 | C | Apt 1L · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | May 27, 2026 |
| May 13, 2026 | C | Apt 1L · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE SECONDARY ENTRANCE DOOR HINGES IN THE ENTRANCE LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | May 27, 2026 |
| May 13, 2026 | A | §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMA | Aug 16, 2026 |
| Feb 25, 2019 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL | May 31, 2019 |
| Jan 17, 2019 | A | Apt 3R · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... CERAMIC TILES AT EAST WALL ( APPROX 2 SQ FT ) IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 22, 2019 |
| Jan 17, 2019 | B | Apt 3R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 21, 2019 |
| Jan 17, 2019 | A | Apt 3R · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CLOSET DOOR KNOB IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 22, 2019 |
| Jan 17, 2019 | B | Apt 3R · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... NORTH WALL ( APPROX 2 SQ FT ) IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 21, 2019 |
| Jan 17, 2019 | A | Apt 3R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 22, 2019 |
| Jan 17, 2019 | B | Apt 3R · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF NAIL PROTRUDING OUT FROM WOOD FLOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 21, 2019 |
| Jan 17, 2019 | B | Apt 3R · § 27-2018 ADMIN. CODE: ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 21, 2019 |
| Jan 17, 2019 | A | Apt 3R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST WALL CABINET IN THE KITCHEN LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 22, 2019 |
| Jan 17, 2019 | B | Apt 3R · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE 5th ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 21, 2019 |
| Jan 17, 2019 | B | Apt 3R · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR BUZZER AT SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 21, 2019 |
| Jan 17, 2019 | A | Apt 3R · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION STEAM RISER IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 22, 2019 |
| Jan 17, 2019 | B | Apt 3R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 21, 2019 |
| Jan 17, 2019 | B | Apt 3R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 21, 2019 |
| Jun 4, 2018 | A | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE PUBLIC HALL AND PUBLIC HALL STAIRS THROUGHOUT ALL STORIES | Sep 7, 2018 |
| Jun 4, 2018 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS AT BULKHEAD, ROOF | Sep 7, 2018 |
| Jun 4, 2018 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Sep 7, 2018 |
| Jun 4, 2018 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Sep 7, 2018 |
| May 31, 2018 | B | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WOOD CASING ( MOULDINGS ) AT DOOR, 1ST STORY, PUBLIC HALL, | Jul 5, 2018 |
| May 31, 2018 | B | Apt 3R · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 5, 2018 |
| May 31, 2018 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLE ATTTACHED TO STAIR BALUSTRADE , 3RD STORY, AT PUBLIC HALL, | Jul 5, 2018 |
| May 29, 2018 | A | Apt 3R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 1, 2018 |
| May 29, 2018 | C | § 27-2005 ADM CODE PROVIDE WIRE GLASS AT GLASS PANES, BELOW SKYLIGHT, 3RD STORY , PUBLIC HALL STAIR | Jun 6, 2018 |
| May 29, 2018 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CONRETE PAD WITH PVC PIPE AT STAIR, BASEMENT STORY, BUILDING FRONT YARD | Jul 3, 2018 |
| May 29, 2018 | B | Apt 3R · § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ... IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 3, 2018 |
| May 29, 2018 | C | Apt 3R · § 27-2005, 2007 HMC: REMOVE THE ILLEGAL DOUBLE CYLINDER KEY OPERATED LOCKING DEVICE AT DOOR DOUBLE CYLINDER ( MORTISE LOCK) AT DOOR IN THE 5th ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 6, 2018 |
| May 29, 2018 | A | Apt 3R · § 27-2041 ADM CODE PROVIDE A PEEP HOLE IN ENTRANCE DOOR OF THE DWELLING UNIT SO LOCATED SO AS TO PERMIT A PERSON INSIDE THE DWELLING TO VIEW ANY PERSON OUTSIDE ENTRANCE DOOR ... IN THE 5th ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 1, 2018 |
| May 29, 2018 | C | Apt 3R · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 4; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APA | Jun 26, 2018 |
| May 29, 2018 | A | Apt 3R · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT ( APPROXIMATELY 2SQFT) NORTH WALL IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 1, 2018 |
| May 29, 2018 | A | Apt 3R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM SOUTH AT WEST WALL, 1st DOOR FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 1, 2018 |
| Dec 21, 2017 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM .. AT PUBLIC HALL, 1st STORY | Dec 29, 2017 |
| Dec 21, 2017 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Mar 26, 2018 |
| Dec 21, 2017 | A | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX .. AT PUBLIC HALL, 1st STORY | Mar 26, 2018 |
| Dec 21, 2017 | A | § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY | Mar 26, 2018 |
| Dec 21, 2017 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Mar 26, 2018 |
| Nov 6, 2017 | A | Apt 3R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 5th ROOM FROM NORTH, THE 3rd ROOM FROM NORTH, THE 2nd ROOM FROM NORTH, THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 9, 2018 |
| Nov 6, 2017 | B | Apt 3R · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT THE NORTH WALL IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 11, 2017 |
| Nov 6, 2017 | C | Apt 3R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM | Dec 4, 2017 |
| Oct 10, 2017 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Jan 13, 2018 |
| Oct 10, 2017 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 1st STORY | Jan 13, 2018 |
| Oct 10, 2017 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Jan 13, 2018 |
| Sep 15, 2017 | A | Apt 3R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 5th ROOM FROM NORTH, THE 2nd ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 19, 2017 |
| Sep 15, 2017 | A | Apt 3R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. BASEBOARD AT WEST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 19, 2017 |
| Apr 20, 2017 | B | § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ,AT BULKHEAD , 3rd STORY | May 25, 2017 |
| Apr 18, 2017 | C | Apt 3R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT EAST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st AP | May 16, 2017 |
Showing 60 of 70. Full list on the agency site.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 11:08 PM ET. BBL 4012380002.