Manhattan · Block 1078 · Lot 20 · 10019

517 West 49 Street

12 floors · 49,870 sq ft · built 1986 · class N2 · owner of record: Homes For The Homeless Institute, Inc.

4open violations
$3,750ECB/OATH penalties owed
0HPD class C (immediately hazardous)
46dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 46 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 49,870 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 167 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 167 days
Annual filing
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $45,500 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 463 days
No Cycle 10 report on record yet

Open violations

ECB / OATH (1) · $3,750 owed
IssuedViolationHearingBalance
Mar 19, 2026Construction CLASS - 1
OBSERVED ON 10TH FLOOR SPRINKLER HEADS OBSTRUCTED. PIPE PENETRATIONS ARE ON 9TH, 8TH AND BASEMENT FLOOR WITH NO FIRE STOP. BASEMENT EYE WASH SINKS NOT VENTED PROPERLY AND USING JIM CAPS ON WASTE LINE. BATHROOMS
#39181146L
Jun 10, 2027
DEFAULT
$3,750
DOB (4)
IssuedViolationStatus
Apr 13, 2026CONSTRUCTION
FTM. OBSRVD ON EXP 1 S.ELEV: CRACKS IN PARAPET MASONRY @ 11TH FLR & 13 FLR SETBACK (BRICK AND STONE WORK). EXP 3 N.ELEV: STEPCRACKS IN BRICK WORK @ 11 FLR SETBACK PARAPET, MISSING DAMAGED MORTAR @ MULTIPLE LOCATION ON 11 FLR. REMEDY: REPAIR AND OR REPLACE DAMAGE MASONRY (BRICKS & STONE WORK; MORTAR
#SR0401RF
DOB VIOLATION - ACTIVE
Nov 24, 2025CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER AS PER SECTION 28.301.1 OF THE NYC ADMIN CODE. NOTED AT TIME OF INSPECTION OBSERVED VERTICAL CRACK ON EXPOSURE 1. ALSO AT ROOF ELEVATION NORTH VERTICAL STEP CRACKS & ROOF ELEVATION ON 11TH FLOOR SET BACK BROKEN GLASS REMEDY: REPAIR AND/OR REPLACE
#SR0401BB
DOB VIOLATION - ACTIVE
Aug 15, 2025CONSTRUCTION
FAILUURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVED LOOSE BROKEN OFF STUCCO AT GRAVITY TANK WALL.CRACK AT 14TH FLOOR SETBACK ARC H WALL OVER EXP1.CRACK GLASS BRICK AT BULKHEAD STAIR A.OBSERVED CRACK COPING STONE AT OTHER SETBACK AREA OF EXP3 SUCH AS GLASS,BRICK,CRACKS REMEDY:REPAIR AND/O
#SR0402NS
DOB VIOLATION - ACTIVE
Nov 7, 1990CONSTRUCTION

#C4RD01
VIOLATION UNSERVED ECB-ACTIVE
DOB NOW Safety (0)

None open.

HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 5:16 AM ET. BBL 1010780020.

Look up another building