Bronx · Block 4016 · Lot 31 · 10460

515 Van Nest Avenue

3 floors · 3 apartments · 3,503 sq ft · built 2017 · class C0 · owner of record: Unavailable Owner

1open violations
$6,250ECB/OATH penalties owed
1HPD class C (immediately hazardous)
60dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 60 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 60 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 76 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 304 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 425 days
Next cycle year 2027

Open violations

ECB / OATH (3) · $6,250 owed
IssuedViolationHearingBalance
Feb 14, 2019Construction CLASS - 1
FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35376378P ISSUED ON 12/5/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. FOR WORK W/O A PERMIT. REM
#35394708H
Aug 12, 2019
IN VIOLATION
$1,250
Dec 5, 2018Construction CLASS - 1
WORK W/O A PERMIT. NOTED: AT CELLAR LEVEL FULL HEIGHT PARTITION WALLS ERECTED AT VARIOUS LOCATIONS. 1-TO SUBDIVIDE FLOOR (FRONT AND BACK); 2-CREATED 2 BATHROOMS, WATER AND WASTE LINES INSALLED FOR 2 3PC BATHR
#35376378P
May 10, 2019
IN VIOLATION
$2,500
Dec 5, 2018Unknown CLASS - 2
RESIDENCE CONVERTED MAINTAINED OR OCCUPIED AS A DWELLING FOR MORE THANTHE LEGALLY APPROVED NUMBER OF FAMILIES AUTHORIZED BY THE COFO OR OFFICIAL DEPT RECODS. NOTED: CO#220493197F INDICATES A 3FAMILY BASEMENT, 1
#35376377N
May 10, 2019
IN VIOLATION
$2,500
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (1) · C 1 · B 0 · A 0
IssuedClassViolationCorrect by
Aug 6, 2025C§ 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE BOILER ROOM ENTRANCE DOOR AT BOILER ROOMAug 12, 2025

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 1, 2026, 4:19 AM ET. BBL 2040160031.

Look up another building