40 floors · 323 apartments · 467,115 sq ft · built 1985 · class RM · owner of record: 515 East 72nd Street Condominium
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 43 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 43 days | Annual |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-06-30 (Accepted). Agency page | Dec 31, 2026 in 43 days | 2 of 2 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 59 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $36,750 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 95 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 467,115 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 164 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 164 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 287 days | Registered through 2027-09-01 |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1484). Agency page | Dec 31, 2034 in 2965 days | Next due 2034 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 4, 2024 | Construction CLASS - 2 ATI, OBSERVED 4 ACTIVE SUSPENDED SCAFFOLDS AT EXP. 1. UPON REVIEWING CD-5 NOTICE NO STYROFOAM AT BASE, GC USE EXISTING STYROFOAM NO MANUFACTURE SPECS PROVIDED. SUSPENDED PLATFORM NOT CONFORMING WITH MANUFACTURE #39529278H | May 15, 2025 IN VIOLATION | $0 |
| Jun 4, 2024 | Construction CLASS - 2 AT TIME OF INSPECTION, OBSERVED ACTIVE JOBSITE. UPON INSPECTING SITE SAFETY PLAN OBSERVED ON PAGE 10 DETAIL FOR TREE PROTECTION. OBSERVED SEVERAL TREES WITHOUT PROTECTION. SIDEWALK SHED DRAWINGS SHOWS PIPE ANCH #39529274K | Dec 12, 2024 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 16, 2022 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS #00240 | DOB VIOLATION - ACTIVE |
| Feb 16, 2022 | HAZARDOUS CONDITION (FACADE) CYCLE 9A UNSAFE REPORT FILED #909696 | DOB VIOLATION - ACTIVE |
| Oct 29, 2009 | ELEVATOR #9011/317200 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Sep 23, 2026 | Parking Structures FTF-PS-INITL Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13 | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Feb 16, 2022 | Facades FISPHAZ CYCLE 9A UNSAFE REPORT FILED | Active |
| Feb 16, 2022 | Facades FISPFCS CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Sep 23, 2026 | DOB Safety | Parking Structures: Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)