Manhattan · Block 1085 · Lot 23 · 10019

513 West 56 Street

10 floors · 186,100 sq ft · built 1984 · class O6 · owner of record: Cbs Broadcasting Inc.

38open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
46dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 46 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $11,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 98 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 186,100 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 167 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 167 days
Annual filing
Energy audit and retro-commissioning (2035) Likely applies
Local Law 87 · Calendar year 2035
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1085). Agency page

Dec 31, 2035
in 3333 days
Next due 2035

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Aug 31, 2005Site Safety Non-Hazardous
FAILURE TO PROVIDE CONTRACTOR'S SIGN. REMEDY: PROVIDE SIGN.
#34491336Y
Apr 6, 2006
IN VIOLATION
$0
DOB (18)
IssuedViolationStatus
Sep 23, 2024HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
#00143
DOB VIOLATION - ACTIVE
Sep 23, 2024HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
#00983
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
#02952
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
#04084
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
#01736
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
#00583
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
#03057
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
#04200
DOB VIOLATION - ACTIVE
Apr 25, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
#01434
DOB VIOLATION - ACTIVE
Apr 25, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
#00285
DOB VIOLATION - ACTIVE
Dec 1, 2022FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2200249
DOB VIOLATION - ACTIVE
Aug 3, 2022FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00024
DOB VIOLATION - ACTIVE
Jun 2, 2022FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00063
DOB VIOLATION - ACTIVE
Jun 3, 2021FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00046
DOB VIOLATION - ACTIVE
Jun 1, 2016NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST
FAILURE TO PERFORM CATEGORY 5 INSPECTION
#03157
DOB VIOLATION - ACTIVE
Jan 31, 2013NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
#20072
DOB VIOLATION - ACTIVE
Mar 31, 2008EMERGENCY POWER

#NRF00618
DOB VIOLATION - ACTIVE
Aug 8, 2002LOCAL LAW 11/98 - FACADE

#NRF50931
DOB VIOLATION - ACTIVE
DOB NOW Safety (19)
IssuedViolationStatus
Nov 25, 2024Parking Structures FTF-PS-INITL
Failure to file sub cycle 1A compliance report by 12/31/2023
Active
Sep 23, 2024Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
Active
Sep 23, 2024Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
Active
Apr 25, 2023Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE BOILER INSPECTION
Active
Apr 25, 2023Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION
Active
Dec 1, 2022Energy Grade - LL33 FTP-EN-EGRDEA
Active
Aug 3, 2022Benchmarking - LL84 FTF-EN-BENCH
Active
Jun 2, 2022Benchmarking - LL84 FTF-EN-BENCH
Active
Jun 3, 2021Benchmarking - LL84 FTF-EN-BENCH
Active
Jun 1, 2016Elevators EVCAT5
Active
Jan 31, 2013Facades FISPNRF
FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
Active
Mar 31, 2008Emergency Power FTF-EL-ENRF
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 12:12 AM ET. BBL 1010850023.

Look up another building