3 floors · 2 apartments · 3,621 sq ft · built 1931 · class S2 · owner of record: Great Eastern Barry Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2022-05-24 (Accepted). Agency page | Dec 31, 2026 in 62 days | 1 of 1 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 306 days | Required only if the owner doesn't live there |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1158 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 13, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35314833Y ISSUED ON 10/19/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. FOR FAILURE TO PROVIDE PR #35396842H | Jun 25, 2019 IN VIOLATION | $625 |
| Jan 22, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35314833Y ISSUED ON 10/19/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. FOR NOT PROVIDING PROTECT #35391377Z | Apr 29, 2019 IN VIOLATION | $625 |
| Oct 19, 2018 | Construction CLASS - 1 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS.AT TIME OF INSPECTION OBSERVED AN ACTIVE CONSTRUCTION SITE WITH FOUNDATION WORK IN PROGRESS AT THE REAR YARD,DURING INSPECTION NOTED THAT THERE IS NO SOE #35351286R | Apr 1, 2019 IN VIOLATION | $2,500 |
| Oct 19, 2018 | Construction CLASS - 1 FAILURE TO PROVIDE PROTECTION AT SIDES OF EXCAVATION. OBSERVED:CONTRACTOR DOING FOUNDATION WORK UNDER VALID PERMIT#321578495 AND APPROVED SET OF DRAWINGS DATED(5/10/18). IN ACCORDANCE W/ DRAWINGS SDE-100.00&FO- #35314833Y | May 1, 2019 IN VIOLATION | $5,000 |
| Oct 19, 2018 | Construction CLASS - 1 FAILURE TO SAFEGUARD ALL PERSON SAND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.AT TIME OF INSPECTION OBSERVED THAT THE CONTRACTOR EXCAVTED AT THE REAR SIDE AND THE FIRE ESCAPE LADDER DID NOT HAVE LADNING CRE #35351290J | May 1, 2019 IN VIOLATION | $10,000 |
| Oct 19, 2018 | Construction CLASS - 1 NO RULE 52,AT TIME OF INSPECTION AFTER SEARCH AT THE BIS SYSTEM NOTED THAT THE CONTRACTOR DID NOT NOTIFY THE DEPARTMENT WITHIN 24-48 HOURS OF THE START OF EXCAVATION AS REQUIRED BY CODE.COMPLY WITH CODE #35351289M | May 1, 2019 IN VIOLATION | $2,500 |
| Oct 19, 2018 | Construction CLASS - 2 3301.7:NO MONITORING REPORTS.AT TIME OF INSPECTION I REQUESTED FOR MOTITORING REPORTS AFTER THE CONTRACTOR EXCAVATED AT THE REAR YARD AND THEY DID NOT HAVE THE, AT JOB SITE AS REQUIRED BY CODE.COMPLY WITH CODE. #35351288K | May 1, 2019 IN VIOLATION | $1,250 |
| Oct 19, 2018 | Site Safety CLASS - 1 CONSTRUCTION SUPERTENDENT FAILED TO PERFORM DUTIES PER CODE.AT TIME OF INSPECTION OBSERVED SEVERAL VIOLATING CONDITIONS(1)WORK DOES NOT CONFORM PLANS (2)NO MONITORING REPORTS(3)NO RULE 52(4) NO FIRE ESCAPE FOR #35351287Z | May 15, 2019 IN VIOLATION | $10,000 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #08552 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #07668 | DOB VIOLATION - ACTIVE |
| Apr 22, 2021 | CONSTRUCTION #E0701NH | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #10218 | DOB VIOLATION - ACTIVE |
| Jan 9, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00554 | DOB VIOLATION - ACTIVE |
| Jan 9, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00553 | DOB VIOLATION - ACTIVE |
| Jan 9, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00551 | DOB VIOLATION - ACTIVE |
| Nov 2, 2018 | CONSTRUCTION COMPLY WITH VACATE ORDER #0703GB | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Jan 9, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Jan 9, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Jan 9, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Mar 11, 2013 | C | Apt 3 · SECTION 27-2026 ADMIN. CODE: REPLACE THE BROKEN OR DEFECTIVE WASH BASIN IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 17, 2013 |
| Mar 11, 2013 | C | Apt 3 · SECTION 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE LINE AT SINK IN THE KITCHEN LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 17, 2013 |
| Mar 8, 2013 | B | SECTION 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 3rd STORY | Apr 12, 2013 |
| Mar 8, 2013 | C | Apt 3 · § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 7, 2013 |
| Mar 8, 2013 | B | Apt 3 · SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 12, 2013 |
| Nov 13, 2012 | B | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FRAME AROUND DOOR AT THE BUILDING ENTRANCE , 1st STORY | Dec 18, 2012 |
| Nov 13, 2012 | C | SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MORTISE LOCK AT THE ENTRANCE DOOR TO BUILDING AT PUBLIC HALL, 1st STORY | Nov 19, 2012 |
| Nov 13, 2012 | A | SECTION 27-2005 ADM CODE REFIT DOOR AT THE BUILDING ENTRANCE , 1st STORY | Feb 16, 2013 |
| Jan 6, 2009 | C | SECTION 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK AT BUILDING ENTRANCE DOOR , 1st STORY | Jan 12, 2009 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 1:26 AM ET. BBL 3008000145.