4 floors · 75,783 sq ft · built 1930 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 75,783 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1165 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 869). Agency page | Dec 31, 2029 in 1165 days | Next due 2029 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-15 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 17, 2026 | Construction CLASS - 2 REISSUE:35717575R-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.FLAG POLE AT ROOF HAS NO STRONG NO FLAG.REM:COMPLY WITH CODE. #35734293N | Jul 15, 2026 POP/IN-VIO | $0 |
| Jun 17, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.CORRIDOR DOOR EXIT#8 2ND FLOOR SC H.I.REM:COMPLY WITH CODE. #35734294P | Jul 15, 2026 POP/IN-VIO | $0 |
| Jun 17, 2026 | Construction CLASS - 2 REISSUE#35717576Z FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.EMERGENCY LIGHTS NOT ALL WORKING AT CAFE AND GYM,AUDITORI #35734292L | Jul 15, 2026 POP/IN-VIO | $0 |
| Jun 17, 2026 | Construction CLASS - 2 REISSUE#35717577K FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.BOLT GAS ROOM AND ELECTRICAL ROOMS OVER 6 GAS POWERED SNOW BLOWERS.REM:COMPLY WITH CODE. #35734291J | Jul 15, 2026 POP/IN-VIO | $0 |
| May 21, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS AS PER BC 1006.1; 27-381. NOTED: SEVERAL EMERGENCY LIGHTS SCATTERED THROUGHOUT THE SCHOOL WERE #35717576Z | Jul 7, 2025 POP/IN-VIO | $0 |
| May 21, 2025 | Construction CLASS - 2 RE-ISSUE #35684833M. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: THE FLAG POLE AT THE ROOF LEVEL IS NON-USABLE BECAUSE PARTS(PULLEY) ARE MISSING. REMEDY: REPAIR/REPLACE FLAG POLE. #35717575R | Jul 7, 2025 POP/IN-VIO | $0 |
| May 21, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVEDAT T. O. I. IN BOTH GAS AND ELECTRIC METER ROOMS, THERE IS ILLEGAL STORAGE OF COMBUSTABLE MATERIALS. REMEDY: REMOVE ALL STORAGE FROM GAS AND #35717577K | Jul 7, 2025 POP/IN-VIO | $0 |
| Sep 12, 2024 | Construction CLASS - 2 REISSUE#35655519L FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT TIME OF MY INSPECTION I OBSERVED DURING MY INSPECTION AT ROOF LEVEL FLAT POLE MISSING PULLEY AND FLAG CAN'T BE FLOWN NEET TO MAKE REPAI #35684833M | Nov 20, 2024 POP/IN-VIO | $0 |
| Jun 10, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER.NOTED:OBSERVED DURINGINSP OF ROOF LEVEL FLAGPOLE MISSING PULLEY&FLAG CANT BE FLOWN.REPAIR &OR REPLACE #35655519L | Nov 2, 2022 POP/IN-VIO | $0 |
| Mar 24, 2022 | Unknown CLASS - 2 FAILURE TO OBTAIN TEMP PERMIT PRIOR TO INSTALLATION/USE OF TEMP EQUIPMENT OBSERVED SWS ERECTED@EXP1,2,3 NO ACTIVE PERMIT ISSUED ON BIS/DOBNOW FOR SWS OBTAIN TEMP CONST PERMIT #35586502Z | Aug 24, 2022 POP/IN-VIO | $0 |
| Oct 8, 2020 | Elevators CLASS - 1 NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NYCBC. THIS IS A CONTROLLER FEATURE WHICH ENSURES PASSENGER SAFETY. REMEDY; FILE APPLICATION, INSTALL DLM A #39030146N | Oct 21, 2020 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Oct 6, 1995 | CONSTRUCTION HAZ #07RD01 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 3:14 PM ET. BBL 3008690001.