| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2020-10-16 (Accepted). Agency page | Dec 31, 2026 in 68 days | 2 of 2 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 125,632 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1277). Agency page | Dec 31, 2027 in 433 days | Next due 2027 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $185,750 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 485 days | No Cycle 10 report on record yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1164 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 1, 2025 | Unknown CLASS - 2 OBSERVED SUPPORTED SCAFFOLD INSIDE ELEVATOR SHAFT IMPROPERLY ASSEMBLED. SCAFFOLD LACKED REQUIRED TOE BOARDS AND GUARDRAIL,PLANKS WERE UNSECURED AND NOT OSHA APPROVED. STRUCTURE POSES A SEVERE FALL HAZARD. UNSAF #39539736P | Oct 26, 2026 DEFAULT | $5,000 |
| Jun 17, 2024 | Construction CLASS - 2 A. C. 27-929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MOR #37028857Y | Apr 2, 2025 DEFAULT | $0 |
| Feb 28, 2023 | Construction CLASS - 2 A.C.27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100' OR MORE IN HE #37025439H | Dec 14, 2023 ADMIT/IN-VIO | $0 |
| Nov 1, 2021 | Construction CLASS - 2 27-929.1 FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL IN OFFICE BUILDING 100 FEET OR MORE IN HEIGHT IN EXIST #37022655Z | Jul 21, 2022 IN VIOLATION | $0 |
| Jul 13, 2020 | Construction CLASS - 2 AC 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL YSTSEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERATED DESIGN PRFESSIONAL BY JULY 1, 2019 IN AN OFFICE BUILDING 10 #37019856H | Apr 29, 2021 IN VIOLATION | $0 |
| Nov 15, 2019 | Construction CLASS - 2 27-929.1 A.C. 27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BUILDIN #37016548M | Feb 20, 2020 STIPULATION/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 19, 2026 | CONSTRUCTION FTM BLDG. OBSERVED ON EXP 2 CRACKS IN LINTEL AT 2ND FLOOR; OPEN MORTAR JOINTS AND CRACK IN WATER TABLE MASONARY. EXP 3; DAMAGED SPALLED STONE ABOVE HEAD HEIGHT TO THE RIGHT OF REAR ENTRANCE. REMEDY: REPAIR AND/OR REPLACE #SR0501RF | DOB VIOLATION - ACTIVE |
| Sep 20, 2024 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO CRACK DETERIORATION OF DECORATIVE STONE @ 2ND FL CORNICE OF EXPOSURE 2 NORTH ELEVATION LOCATION AT EAST & WEST CORNER. REMEDY: IMMEDIATELY INSTALL PUBLIC PROTECTION AT NORTH, EAST & WEST CORNER. MAKE IMMEDIATE REPAIRS UNDER SUPERVISION OF NYC LICENSED PROFESSIONAL #SR0502NS | DOB VIOLATION - ACTIVE |
| Sep 20, 2024 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXPOSURE 2 NORTH ELEVATION AT 2 FLOOR CORNICE. CRACKS STONE CORNER OF EXPOSURE 1 AND EXPOSURE 3. DAMAGE STONE AT FOUNDATION CORNER OF 1 AND 2 AND DAMAGED JOINTS. REMEDY: MAINTAIN BUILDING REPAIR AND/OR REPLACE #SR0501NS | DOB VIOLATION - ACTIVE |
| Nov 10, 2022 | HAZARDOUS CONDITION (FACADE) CYCLE 9B UNSAFE REPORT FILED #910545 | DOB VIOLATION - ACTIVE |
| Jun 1, 2022 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00196 | DOB VIOLATION - ACTIVE |
| Dec 10, 2021 | ELEVATOR #9027/712306 | DOB VIOLATION - ACTIVE |
| Dec 10, 2021 | ELEVATOR #9027/712304 | DOB VIOLATION - ACTIVE |
| Dec 10, 2021 | ELEVATOR #9027/712305 | DOB VIOLATION - ACTIVE |
| Dec 10, 2021 | ELEVATOR #9027/712307 | DOB VIOLATION - ACTIVE |
| Dec 1, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2100692 | DOB VIOLATION - ACTIVE |
| Dec 1, 2020 | ELEVATOR #9027/692498 | DOB VIOLATION - ACTIVE |
| Sep 3, 2019 | SPRINKLER FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019 #NRF00504 | DOB VIOLATION - ACTIVE |
| Feb 21, 2018 | FACADE SAFETY PROGRAM #HAZ87332 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 25, 2026 | Benchmarking - LL84 DQ-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Report | Active |
| Nov 10, 2022 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
| Jun 1, 2022 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Dec 1, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Sep 3, 2019 | Sprinklers FTF-SP-FINAL | Active |
| Feb 21, 2018 | Facades FISP CYCLE 8B UNSAFE REPORT FILED | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | DOB Safety | Benchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)