3 floors · 6 apartments · 9,920 sq ft · built 1931 · class S9 · owner of record: Z & Y Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1163 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-13 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 28, 2026 | Construction CLASS - 2 AT THE TIME OF INSPECTION, OBSERVED THE SIDEWALK SHED NOT MAINTAINED IN A SAFE CONDITION. THE PEDESTRIAN WALKWAY WAS OBSTRUCTED BY AN UNAUTHORIZED ENCLOSED STRUCTURE, STORED MATERIALS, AND UNAUTHORIZED ELECTRIC #39557148H | Apr 8, 2027 PENDING | $2,400 |
| Oct 29, 2025 | Construction CLASS - 1 WORK WITHOUT A PERMIT. PIPE SCAFFOLDING EXCEEDS OVER 40' WHICH REQUIRES WORK PERMIT., OBTAIN PERMIT #39165343K | Dec 7, 2026 DEFAULT | $12,500 |
| Oct 29, 2025 | Construction CLASS - 1 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. SIDEWALK SHED HAS PIPE SCAFFOLDING ABOVE WHICH IS CONTRARY TO PLANS STATED ON JOB #B01223072-I1-SH, CONFORM WORK TO APPROVED #39165344M | Dec 7, 2026 DEFAULT | $2,530 |
| Oct 29, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT EXPOSURE 1 AT 51ST STREET THEIR ARE MAJOR STEP CRACKS IN FACADE WALL IN BETWEEN THE 2ND AND 3RD FLOOR., REPAIR AND/REPLACE #39165327K | Jul 20, 2026 IN VIOLATION | $2,500 |
| May 13, 2025 | Construction CLASS - 2 ATOI OBSERVED AT APT 1A REMOVAL OF LATH AND PLASTER IN LIVING ROOM AREA INTERIOR WALLS APX 20X6 FEET ALSO REMOVAL OF FIRE STOPPING MATERIAL IN CEILING BETWEEN APARTMENT 1A AND 2A. NO CHANGE TO PARTITIONS, ELECT #39147914X | Jan 12, 2027 PENDING | $1,280 |
| May 11, 2023 | Construction CLASS - 1 ON 51 STREET (NORTH EAST FACADE) THERE ARE MAJOR STEP CRACKS AT FIRST FLOOR AND SECOND TO THIRD FLOORS., MAINTAIN EXTERIOR BUILDING WALL; PROVIDE PROTECTION FOR PUBLIC AND MAKE ALL NECESSARY REPAIRS. #39086137Y | Jul 19, 2023 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Oct 24, 2025 | CONSTRUCTION ADDITIONAL INFORMATION/EXP1&4 WALLS SEVERELY CRACKED,BULGING, COMPROMISED.TEMP SHORNG/BRACNG INSTALLED UNDER EMERGENCY WORK ORDER OWNR TO RTAIN NYSPE TO SBMT WEEKLY MONITORNG PLAN W/CRACK/OPTICAL MONITORNG PLAN TO FEU.SBMT PROPOSD MONITORNG PLAN #FEU30703PN | DOB VIOLATION - ACTIVE |
| May 22, 2025 | CONSTRUCTION 1STFL CAST IRON COLUMN SDWLK VAULT@EXP1(5TH AVE)W/STEEL BEAM CORRODED/ COMPROMISED.FRONT APTS@2NDFL (1A)&3RDL (2A)COMPROMISED,INCLUDING 1STFL COMMERCIAL SPACE.IMMED COMPLY W/COMMISSIONER'S ORDER #342068 (050525FEU30702PN) REQUIRED STABILIZATION WRK CONTINUE DAILY UNDER NYSE SPRVSN #FEU30701PN | DOB VIOLATION - ACTIVE |
| May 5, 2025 | CONSTRUCTION CAST IRON COLUMN AT 1/4 CORNER LEANING.EXP1 MASONRY WALL CRCKD THRUOUT @1STFL TO 3RDFL LOAD BEARNG EXP1 WALL CMPROMISD@1ST THRU 3RDFLRS@APT1A (2NDFL)&2A(3RDFL) SDLK VAULT@EXP4ALNG 5THAVE CMPRMSD.OWNR TO IMMED RTAIN RTAIN GC TO 1.IMMED INSTLL/EXTND SDWLK SHED ALNG EXP1@51ST ALNG FULL WIDTH OF BLDG,2. #FEU30701PN | DOB VIOLATION - ACTIVE |
| May 5, 2025 | CONSTRUCTION 1STFL CAST IRON COLUMN SDWLK VAULT@EXP1(5TH AVE)W/1STFL STEEL BEAM CORRODED/COMPROMISED.FRONT APTS@2NDFL(1A)&3RDFL (2A)COMPROMISED, INCLUDNG 1STFL COMMERCIAL SPACE.OWNR TO RTAIN NYSPE&GC REG W/DOB TO IMMED 1.TEMP SHORE BLDG FRM CELLAR TO ROOF@APTS 1A&2A,&BELOW 2NDFL EXP 1&4 SPANDRELS #FEU30702PN | DOB VIOLATION - ACTIVE |
| May 5, 2025 | CONSTRUCTION PARTIAL VACATE/FAILURE TO MAINTAIN BLDG IN SAFE CONDITION.EXP1.4 CAST IRON COLUMN LEANING@1STFL EXP1 LOAD BEARNG WALL CRCKDTHROUGHOUT 1ST THRY 3RDFL.EXP4 SDWLK VAULT CMPRMSD W/STEEL BEAM@1STFL.OWNR TO RTAIN NYSPE TO EVAL ENT BLDG&FILE RPAIR DWGS W/DOB BLDG TO BE PERM RPAIRD UNDR PRMT STRTNG BY 6/9/2 #FEU30703PN | DOB VIOLATION - ACTIVE |
| Apr 18, 2025 | CONSTRUCTION STRUCTURAL STABILITY INSPECTION AT THE CELLAR & 1ST FLOOR COMMERCIAL S PACE. PLEASE SUBMIT ENGINNERS REPORT BY MONDAY APRIL 21ST TO INCLUDE D ETAILS OF THE SHORING & A LETTER OF OMISSION OWNER TO HIRE NYSPE TO SUBMIT REPORT TO ERT INSPECTIONS@BUILDINGS.NYC GOV BY MONDAY APRIL 21ST ADDRESSING CONDITI #CER03AS | DOB VIOLATION - ACTIVE |
| Apr 18, 2025 | CONSTRUCTION STRUCTURAL STABILITY INSPECTION AT THE CELLAR AND 1ST FLOOR COMMERCIA L SPACE LEVEL-AS PER FEU, IT IS RECOMMENDE TO BE PARTIALLY VACATED DUE TO A STRUCTURAL STABILITY PARTIAL VACATE FOR FLOOR 1 & CELLAR #CER02AS | DOB VIOLATION - ACTIVE |
| May 22, 2023 | CONSTRUCTION EMERGENCY WORK ORDR.PER ENGNEER REPORT BY TT DATED 5/17/23,EXP1 BRCK CRCKD OUT&BULGNG OUT @1ST THRU 3RD FLRS NEAR EXP1/4 CRNRBRCK PIER @ CELLAR SETTLED APPRX4 IN. PORTIONS OF BLDG UNSFE&REQUIRES.OWNR TO RTAIN NYS PE&GC TO IMMED:1.INTALL SDWALK SHED ALONG EXP1@51,AS REQ'D, 2.INSTLL BLDG SHORNG/BRACNG #FEU30701PN | DOB VIOLATION - ACTIVE |
| May 11, 2023 | CONSTRUCTION ON 51 STREET (NORTH EAST FACADE) THERE ARE MAJOR STEP CRACKS AT FIRST FLOOR AND SECOND TO THIRD FLOORS. #23-01378 | DOB VIOLATION - ACTIVE |
| May 4, 1998 | LOCAL LAW 62/91 - BOILERS #25184 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #33418 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 7) | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 7) | Active |
| May 4, 1998 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 13, 2026 | C | Apt 1B · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 13, 2026 |
| Oct 13, 2026 | B | Apt 1B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT SOUTH AND WEST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 17, 2026 |
| Oct 13, 2026 | B | Apt 1B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT NORTH, EAST AND SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 17, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING, EAST, SOUTH, WEST AND NORTH WALLS, IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES, IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT EAST AND SOUTH WALLS, IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD BASEBOARD AT WEST WALL, IN THE 5th ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD JAMBS AND STOOL AT 1ST WINDOW FROM SOUTH AT WEST, IN THE 5th ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD JAMBS, CASING AND STOOL AT 2ND WINDOW FROM SOUTH AT WEST, IN THE 5th ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES, IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE WASHBASIN IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE SOUTH AND NORTH WALLS, IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE RUBBER GASKETS AT UPPER AND LOWER REFRIGERATOR DOORS IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK, IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION THE WASTE LINE AT SINK IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES, IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING, EAST AND SOUTH WALLS, IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER SASH 1ST WINDOW FROM SOUTH AT WEST, IN THE 5th ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT THE CEILING, NORTH, SOUTH AND WEST WALLS, IN THE 5th ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES, IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | C | Apt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER SASH 2ND WINDOW FROM NORTH AT EAST, IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 17, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES, IN THE FOYER LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR TILES, IN THE 5th ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD BASEBOARD AT NORTH WALL, IN THE 5th ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD THRESHOLD AT THE ENTRANCE IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE NORTH, WEST AND SOUTH WALLS, IN THE 5th ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING AND SOUTH WALL, IN THE FOYER LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Mar 11, 2026 | B | Apt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PLAN AT THE WOOD CASEMENT WINDOW IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 15, 2026 |
| Oct 29, 2025 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY | Feb 1, 2026 |
| Oct 29, 2025 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. | Feb 1, 2026 |
| Oct 29, 2025 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Feb 1, 2026 |
| Oct 29, 2025 | A | §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAILBOX AT PUBLIC HALL, 1st STORY | Feb 1, 2026 |
| Oct 29, 2025 | A | §27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN PRIVATE DWELLINGS | Feb 1, 2026 |
| Oct 29, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 3rd STORY | Feb 1, 2026 |
| Jul 28, 2025 | B | Apt 2 · § 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE LINE AT SINK IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 1, 2025 |
| Jul 28, 2025 | B | Apt 2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 1, 2025 |
| Jul 28, 2025 | B | Apt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH SPRING BALANCE AT THE 1ST WINDOW FROM WEST AT NORTH IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 1, 2025 |
| Jul 28, 2025 | A | Apt 2 · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 31, 2025 |
| Jul 28, 2025 | B | Apt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH SPRING BALANCE AT THE 2ND WINDOW FROM EAST AT SOUTH IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 1, 2025 |
| Jul 28, 2025 | A | Apt 2 · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 31, 2025 |
| Jul 28, 2025 | B | Apt 2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 1, 2025 |
| Jul 28, 2025 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 1, 2025 |
| Jul 28, 2025 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 1, 2025 |
| Jul 28, 2025 | B | Apt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CERAMIC TILES AT THE WEST WALL IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 1, 2025 |
| Jul 28, 2025 | B | Apt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR AT THE EAST WALL IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 1, 2025 |
| Jul 28, 2025 | B | Apt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH SPRING BALANCE AT THE NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 1, 2025 |
| Jul 28, 2025 | A | Apt 2 · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 31, 2025 |
| Jul 17, 2025 | A | § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. | Oct 20, 2025 |
| Jul 17, 2025 | C | § 27-2044, 2041.1 HMC: §238 MDL and 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING THE DOORS THAT IS MISSING OR DEFECTIVE HINGES AT VESTIBULE DOOR , 1st STORY | Jul 31, 2025 |
| Jul 17, 2025 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Oct 20, 2025 |
| Jul 17, 2025 | B | Apt 3K · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 3K, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 21, 2025 |
| Jul 17, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT VESTIBULE , 1st STORY | Aug 21, 2025 |
| Jul 17, 2025 | C | Apt 3K · § 27-2044, 2041.1 HMC: §238 MDL and 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING THE DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 3K, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 31, 2025 |
| Jul 17, 2025 | B | Apt 3K · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). THAT IS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3K, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 21, 2025 |
| Jul 17, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT BULKHEAD , 3rd STORY | Aug 21, 2025 |
| Jul 17, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT BULKHEAD , 3rd STORY | Oct 20, 2025 |
| Jul 17, 2025 | C | § 27-2044, 2041.1 HMC: §238 MDL and 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING THE DOORS THAT IS MISSING OR DEFECTIVE HINGES AT FIRE DOOR LEADING TO ROOF AT WEST AT BULKHEAD , 3rd STORY | Jul 31, 2025 |
| Jul 17, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 3rd STORY | Aug 21, 2025 |
Showing 60 of 140. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 13, 2026 | HPD C | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Oct 13, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT SOUTH AND WEST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Oct 13, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT NORTH, EAST AND SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Jul 28, 2026 | ECB | Construction: AT THE TIME OF INSPECTION, OBSERVED THE SIDEWALK SHED NOT MAINTAINED IN A SAFE CONDITION. THE PEDESTRIAN WALKWAY WAS OBSTRUCTED BY AN UNAUTHORIZED ENCLOSED STRUCTURE, STORED MATERIALS, AND UNAUTHORIZED ELECTRIC | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 6:58 AM ET. BBL 3008000009.