Manhattan · Block 2076 · Lot 41 · 10031

510 West 145 Street

2 floors · 18,120 sq ft · built 1972 · class P9 · owner of record: West 145 Corp

5open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
42dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 42 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 42 days
Keep the report on file (not filed with DOB)

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Jun 22, 2018Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER:ILUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381 AT 2ND FLOOR ROOM NO-1 ENTRANCE TO ROOM ONE PLACE TWO LIGHTS. EXISTING EMERG
#35335586Z
Aug 9, 2018
DEFAULT
$0
Nov 29, 2016Construction CLASS - 2
FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER. NOTED: AT TIME OF INSPECTION I OBSERVED WATER PENETRATION FROM THE ROOF CAUSING LEAKS & WATER PENETRATION FROM THE ROOF CAUSING LEAKS AND WATER DAMAGE AT 2ND
#35221574X
Aug 17, 2017
IN VIOLATION
$0
DOB (2)
IssuedViolationStatus
Feb 15, 1995CONSTRUCTION

#09BL02
DOB VIOLATION - ACTIVE
Feb 15, 1995CONSTRUCTION

#09BL02
VIOLATION UNSERVED ECB-ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 9)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 19, 2026, 10:35 AM ET. BBL 1020760041.

Look up another building