3 floors · 59,200 sq ft · built 1971 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 59,200 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 165 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 165 days | Annual filing |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2008). Agency page | Dec 31, 2028 in 775 days | Next due 2028 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1140 days | Next cycle year 2029 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-14 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 4, 2026 | Construction CLASS - 2 REISSUE: 35691823Y-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: AT SANDBOX FOR FIRE HOSE HAS GLASS MISSING FROM FACET. REMEDY: COMPLY WITH CODE. #35725024K | Feb 13, 2026 POP/IN-VIO | $0 |
| Feb 4, 2026 | Construction CLASS - 2 REISSUE: 35692824X-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: CELLAR HAS 6 GAS MACHINES STORED IN THE BUILDING. REMEDY: COMPLY WITH CODE. #35725023Z | Feb 13, 2026 POP/IN-VIO | $0 |
| Feb 4, 2026 | Construction CLASS - 2 REISSUE: 35691822M-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: RM 319 CEILING HAS WATER DAMAGE. REMEDY: COMPLY WITH CODE. #35728625J | Feb 13, 2026 POP/IN-VIO | $0 |
| Mar 10, 2025 | Construction CLASS - 2 REISSUE: 35672431L-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: RM 319 CEILING HAS WATER DAMAGE. REMEDY: COMPLY WITH CODE. #35691822M | Apr 23, 2025 POP/IN-VIO | $0 |
| Mar 10, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: MECHANICAL RM @CELLAR HAS STORAGE THATS EXCESSIVE AND 6 GAS MACHINES STORED IN CELLAR. REMEDY: COMPLY WITH CODE. #35691824X | Apr 23, 2025 POP/IN-VIO | $0 |
| Mar 10, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ALL STANDBOX FOR FIRE HOSE VALVE HAS GLASS MISSING FROM EACH BOX. REMEDY: COMPLY WITHCODE. #35691823Y | Apr 23, 2025 POP/IN-VIO | $0 |
| Feb 6, 2024 | Construction CLASS - 2 REISSUE#35671609P FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.#319 CEILING AND ROOM ATTACHED HAS SPALLING DUE TO WATER DAMAGE.REM:COMPLY WITH CODE. #35672431L | May 2, 2024 POP/IN-VIO | $0 |
| Jan 27, 2023 | Construction CLASS - 2 REISSUE #35643294L FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:SPALLING PLASTER IN ROOM #319 DUE TO ROOF LEAK.REMEDY:REPAIR/REPLACE #35671609P | Apr 12, 2023 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #21835 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #21836 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 11:23 AM ET. BBL 3020080001.