Brooklyn · Block 5962 · Lot 11 · 11209

510 77 Street

3 floors · 2 apartments · 2,940 sq ft · built 1931 · class S9 · owner of record: Butsikares, Socratesm

18open violations
$18,750ECB/OATH penalties owed
1HPD class C (immediately hazardous)
781dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 294 days
Required only if the owner doesn't live there
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 781 days
Next cycle year 2028

Open violations

ECB / OATH (3) · $18,750 owed
IssuedViolationHearingBalance
Apr 16, 2025Construction CLASS - 2
FAILURE TO MAINTAIN FOR A/C WINDOW SUPPORTS/FIRE ESCAPE STORAGE. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35665666K ISSUED ON 12/9/2022 AND TO FILE A CERTIFCATE OF CORRECT
#35677195L
Jun 25, 2025
DEFAULT
$6,250
Dec 9, 2022Construction CLASS - 1
FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES.NOTED:ATOI THERE WERE AC UNITS@3FL IMPROPERLY SUPPORTED W/WOODEN BLOCKS&PIECES OF BOARD.ALSOAC UNITS@2FL LEVEL W/O SUPPORT ALSO@FIRE ESCAPE.THERES A PLASTIC GAS B
#35665666K
May 17, 2023
DEFAULT
$12,500
Jun 22, 2018Construction CLASS - 2
FAILURE TO FILE A FINAL INSP FOR COMPLETED WORK W/IN 1 YEAR OF PERMIT EXPIRATION. ALT2 JOB# 320239452 WHICH EXPIRED 9/20/2013 PLUMBING & RENOVATION WALK ON CELLAR IS COMPLETE & SUBSTABTLY COMPLIANT TO PLAN. APP
#35307815P
Aug 29, 2018
IN VIOLATION
$0
DOB (2)
IssuedViolationStatus
Dec 13, 2011LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
#14407
DOB VIOLATION - ACTIVE
Jul 25, 1994LOCAL LAW 62/91 - BOILERS

#04766
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Dec 13, 2011Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Active
Jul 25, 1994Boiler LL6291
Active
HPD (11) · C 1 · B 9 · A 1
IssuedClassViolationCorrect by
Sep 17, 2025C§ 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING DOUBLE CYCLINDER KEY OPERATED LOCK AT ENTRANCE DOOR TO BUILDINGSep 23, 2025
Sep 17, 2025B§ 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLES AND BABY CARRIAGES AT PUBLIC HALL, 1st STORYOct 22, 2025
Sep 17, 2025B§ 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF CASES OF WATER AND FLOWER POTS AT 1st PUBLIC HALL BULKHEAD FROM NORTHOct 22, 2025
Jun 4, 2025B§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF METAL BED FRAME AT PUBLIC HALL, 1st STORY, SECTION ''514''Jul 9, 2025
Jun 4, 2025BApt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CONTROL KNOBS AT GAS RANGE IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''514''Jul 9, 2025
Jun 4, 2025B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES FLOWER POTS AT BUILDING FRONT BALCONY , 3rd STORYJul 9, 2025
Jun 4, 2025BApt 2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''514''Jul 9, 2025
Jun 4, 2025BApt 2 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''514''Jul 9, 2025
Jun 4, 2025BApt 2 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST & NORTH WALLS IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''514''Jul 9, 2025
Dec 19, 2023BApt 2 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... (APROX. 2 SQ FT) AT CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 16168305 ISSUED 17-AUG-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE COJan 23, 2024
Aug 21, 2023AApt 2 · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM WEST AT NORTHNov 24, 2023

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 12:39 PM ET. BBL 3059620011.

Look up another building