4 floors · 9,336 sq ft · built 1910 · class O5 · owner of record: Basil Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1141 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 15, 2024 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #35510681M ISSUED ON 5/17/2021, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERTI #37028366J | Aug 8, 2024 IN VIOLATION | $0 |
| Apr 22, 2024 | Zoning CLASS - 2 ILLEGAL USE IN A COMMERCIAL DISTRICT. UNLICENSED PHYSICAL TREATMENT ESTABLISHMENT, A PROHIBITED USE PER ZR 12-10, OPERATING IN A C6-2M DISTRICT ON UNIT 2F ON 2ND FLOOR. NOTED: INDIVIDUAL OFFER TO PERFORM A FULL #35676890Z | Jun 5, 2025 IN VIOLATION | $0 |
| May 17, 2021 | Construction CLASS - 2 WORK WITHOUT A PERMIT.ILLEGAL WORK NOTED:FULL AND PARTIAL ERECTED PARTITION WALLS CREATING 9 MASSAGE ROOMS ONE LAUNDRY ROOM AND ANOTHER KITCHEN AREA WITH ELECTRIC STOVE.ELECTRICAL WORK INSTALLED FOR LIGHTS AND #35510681M | Jul 29, 2021 STIPULATION/IN-VIO | $0 |
| May 17, 2021 | Zoning CLASS - 2 AT SECOND FLOOR FRONT APARTMENT 2F HAS BEEN OCCUPIED AS ADULT PHYSICALCULTURE ESTABLISHMENT AND PHYSICAL CULTURE ESTABLISHMENT AS PER ZR 12-10 MASSAGE PARLOR ENERGY BODY WORK WITH 9 MASSAGE TABLES IN 9 MASSAGE #35510680K | Sep 16, 2021 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #07121 | DOB VIOLATION - ACTIVE |
| Jan 17, 2020 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #00588 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #02694 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Jan 17, 2020 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 2:21 AM ET. BBL 1008160012.