5 floors · 20 apartments · 9,910 sq ft · built 1900 · class C4 · owner of record: 5153 Monroe Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 64 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 80 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 308 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 795 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-26 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 3, 2026 | Construction CLASS - 1 FIRE ESCAPE DROP DOWN LADDER FROM 2ND FLR TO GROUND FLOOR AT EXPOSURE-1 OF BLDG OBSTRUCTED BY INSTALLATION OF NEW STEEL FENCE AT SIDEWALK LEVEL. LADDER MAKES CONTACT WITH FENCE PREVENTING FULL EXTENSION TO GRAD #39183171M | Jun 11, 2026 IN VIOLATION | $2,500 |
| Mar 25, 2026 | Unknown CLASS - 1 ELECTRICAL WORK WITHOUT A PERMIT. ATOI I OBSERVED MOUNTED AND INSTALLED SPLIT A/C UNIT'S AT ROOF LEVEL OF SUBJECT LOCATION WITHOUT DOB ELECTRICAL APPROVED PERMITS FOR THE SCOPE OF WORK., OBTAIN PERMIT #39181905N | Jan 26, 2027 PENDING | $2,500 |
| Mar 25, 2026 | Unknown CLASS - 1 MISCELLANEOUS CHAPTER 33 VIOLATIONS. ATOI I OBSERVED TPP UNDER JOB (M01285338-I1)NOT BEING COMPLIED WITH UNDER THE EGRESS REQ.(EGRESS SHALL NOT BE OBSTRUCTED AT ANY TIME - ALL EXISTING MEANS OF EGRESS OF THE BU #39181903J | Feb 25, 2027 | $5,000 |
| Mar 25, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. ATOI I OBSERVED EXCESSIVE DUST THROUGHOUT HALLWAYS' AND COMMON AREAS PRODUCING A HEALTH HAZARD., MAINTAIN ADEQUATE CONSTRUCTION HOUSEKEEPING #39181902H | Feb 25, 2027 | $2,500 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jan 28, 2026 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE 3RD,4TH,5TH,15TH,16TH AND 17TH CERAMIC STAIR TREADS FROM BOTTOM UP AT PUBLIC HALL STAIRS, 1st STORY | Feb 3, 2026 |
| Mar 30, 2023 | C | Apt 6 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Apr 25, 2023 |
| Dec 26, 2019 | C | SECTION 27-2056.4 ADM CODE- Correct failure to notify occupants and/or to investigate lead-based paint hazards. | Jan 1, 2020 |
| Sep 17, 2019 | C | Apt B2 · § 27-2056.7 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER IN THE ENTIRE APARTMENT LOCATED AT APT B2 | Oct 15, 2019 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 11:27 AM ET. BBL 1002740003.