4 floors · 99,595 sq ft · built 1967 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 16 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 58 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 99,595 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 179 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 179 days | Annual filing |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3693). Agency page | Dec 31, 2033 in 2615 days | Next due 2033 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-17 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 22, 2026 | Construction CLASS - 2 REISSUE:35717338N DATE OF ISSUE:05.05.2025 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.AT THE TIME OF INSPECTION OBSERV #35734346H | Aug 20, 2026 POP/IN-VIO | $0 |
| Jul 22, 2026 | Construction CLASS - 2 REISSUE#35717339P DATE OF ISSUE:05.05.2025 EXIT DOOR NOT SELF-CLOSING PROPERLY AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 1ST FLOOR EXIT-2 LEFT SIDE ONE EXIT DOOR OUTSIDE EXIT DOOR AND 1ST FLOOR MAIN ENTRA #35734345X | Aug 20, 2026 POP/IN-VIO | $0 |
| May 5, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:IN THE GYMNASIUM ONE LIGHT AND IN THE CAFETERIA FOUR LIGHTS.ALL THESE #35717338N | Jul 9, 2025 POP/IN-VIO | $0 |
| May 5, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING.NOTED:EXIT 2 THE DOOR ON THE LEFT IS NOT OPENING.REM:REPAIR/REPLACE DOOR. #35717339P | Jul 9, 2025 POP/IN-VIO | $0 |
| Mar 23, 2022 | Unknown CLASS - 2 FAILURE TO OBTAIN TEMP PERMIT PRIOR TO INSTALLATION/USE OF TEMP EQUIPMENT OBSERVED SWS ERECTED@EXP1,3 NO FILING IN BIS/DOBNOW FOR PERMIT FORSWS FOUND.OBTAIN TEMP CONST PERMIT #35586501R | Aug 24, 2022 POP/IN-VIO | $0 |
| Dec 14, 2020 | Elevators CLASS - 1 NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NYCBC. THIS IS A CONTROLLER FEATURE WHICH ENSURES PASSENGER SAFETY. REMEDY; FILE APPLICATION, INSTALL DLM A #39033429R | Dec 30, 2020 POP/IN-VIO | $0 |
| Nov 4, 2005 | Boilers Non-Hazardous 50A. 50A INSTALL A PERMANENT INCLINED LADDER TO PROVIDE SAFE ACCESS TO THE TOP OF THE BOILER FOR INSPECTION, MAINTANCE AND OPERATION #32048928Z | Dec 19, 2005 WRITTEN OFF | $0 |
| Nov 4, 2005 | Boilers Non-Hazardous 50A/50B. 50A INSTALL A PERMANENT INCLINED LADDER TO PROVIDE SAFE ACCESS TO THE TOP OF THE BOILER FOR INSPECTION, MAINTANANCE AND OPERATION. 50B PIPE DOWN THE SAFETY VALVE DISCHARGE TO A SAFE POINT. #32048929K | Dec 19, 2005 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #21464 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #21465 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #21466 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Jul 22, 2026 | ECB | Construction: REISSUE:35717338N DATE OF ISSUE:05.05.2025 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.AT THE TIME OF INSPECTION OBSERV | Open |
| Jul 22, 2026 | ECB | Construction: REISSUE#35717339P DATE OF ISSUE:05.05.2025 EXIT DOOR NOT SELF-CLOSING PROPERLY AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 1ST FLOOR EXIT-2 LEFT SIDE ONE EXIT DOOR OUTSIDE EXIT DOOR AND 1ST FLOOR MAIN ENTRA | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 7:41 PM ET. BBL 3036930001.