9 floors · 146,416 sq ft · built 1927 · class O6 · owner of record: West Chelsea Building Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 48 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 48 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 146,416 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 169 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 169 days | Annual filing |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 697). Agency page | Dec 31, 2027 in 413 days | Next due 2027 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $41,850 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 465 days | No Cycle 10 report on record yet |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-12 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 15, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING'S EXTERIOR WALLS AND/OR APPURTENANCES.-ATTIME OF INSPECTION OBSERVED CRACKED/BROKEN WINDOW LITES AT MULTIPLE LOCATIONS OF EXPOSURE 1(NORTH ELEVATION). REMEDY: MAINTAIN EXTERIOR FACA #35689467Y | Mar 27, 2025 IN VIOLATION | $625 |
| Nov 15, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDINGS EXTERIOR WALLS AND/OR APPURTENANCES.AT TIME OF INSPECTION OBSERVED CRACKED CONCRETE,CRACKED WINDOWSILLS AND BROKEN WINDOW PANES AT MULTIPLE LOCATIONS OF EXPOSURE 1(NORTH ELEVATION) #35686796L | Jan 23, 2025 IN VIOLATION | $0 |
| May 23, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCES.NOTE:AT THE TIME OF INSPECTION OBSERVED AT STUCCO EXPO#1 NORTH ELEVATION ON CRACK/SPALLING OFF STUCCO AT SEVERAL LOCATIONS.REM:MAINTAIN EXTERIOR BUILDING WAL #35674253R | Mar 14, 2024 IN VIOLATION | $0 |
| Mar 1, 2023 | Construction CLASS - 1 FAILURE TO PROVIDE ADEQUATE SAFETY MEASURES SUCH AS SHED NETTING ETC WHERE REQUIRED TO PROTECT PUBLIC & PROPERTY FROM DOCUMENTED UNSAFE FACADE AS PER 1RCNY 103-04.FACADE TECHNICAL REPORT FILED AS UNSAFE BY QEWI #35670828K | Feb 15, 2024 IN VIOLATION | $0 |
| Mar 1, 2023 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE & APPURTENANCES.NOTE:OBSERVED AT SOUTHEAST ELEVATION OF EXP #1 & #2 BUILDING & CRACKED CONCRETE AT PARAPET.REMEDY:MAINTAIN EXTERIOR BUILDING FACADE & APPURTENANCES,P #35670829M | May 11, 2023 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 1, 2023 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FAILURE TO CORRECT SWARMP CONDITIONS #00140 | DOB VIOLATION - ACTIVE |
| Oct 4, 2023 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00188 | DOB VIOLATION - ACTIVE |
| Oct 4, 2023 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00189 | DOB VIOLATION - ACTIVE |
| Mar 1, 2023 | CONSTRUCTION EMERGECNY WORK ORDER DUE TO BUILDING/CRACKED CONCRETE@PARAPET OF SO E.ELEV OF(EAST)&EXP#2/SO.ALSO SPALLING&CRACKED CONCRETE@EXP#3WEST REMEDY:IMMED.TAKE & PROVIDE SAFETY MEASURES TO SECURE&PROTECT PUBLIC &INSTALL PUBLIC PROTECTION@EXP#1&2&3ADDITIONALLY REMOVE/SECURE ANY&ALL LOOSE HANGINING MATERIAL.M #FA0401JC | DOB VIOLATION - ACTIVE |
| Feb 21, 2023 | HAZARDOUS CONDITION (FACADE) CYCLE 9B UNSAFE REPORT FILED #911079 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Nov 1, 2023 | Facades FISPFCS CYCLE 9B FAILURE TO CORRECT SWARMP CONDITIONS | Active |
| Oct 4, 2023 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 4, 2023 | AEUHAZ FTC-AEU-HAZ | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Feb 21, 2023 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
| Jul 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 13, 2026, 4:52 PM ET. BBL 1006970042.