5 floors · 20 apartments · 17,450 sq ft · built 1909 · class C1 · owner of record: 508 Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2021-07-15 (Accepted). Agency page | Dec 31, 2026 in 47 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 412 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 15, 2026 | Construction CLASS - 2 FAILURE TO SUBMIT CERTIFICATE OF CORRECTION OF VIOLATION #39058778X ISSUED ON 03-24-2022 FOR FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER., FILE A CERTIFICATE OF CORRECTION #39204107H | Nov 19, 2026 PENDING | $1,250 |
| Mar 24, 2022 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXP #1 OF 5 STORY OCCUPIED MULTIPLE DWELLING (1) FIRE-ESCAPE STAIR TREAD LOCATED BETWEEN 2ND AND 3RD FLOORS IS DETACHED FROM STRINGER CREATING #39058778X | May 12, 2022 DEFAULT | $6,250 |
| Jul 13, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V39032505P ISSUED11/24/20&TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.NO PERMIT ON FILE.COMPLY W/COMMISSIONER'S ORDER &/OR FILE C/C. #35534889H | Sep 30, 2021 IN VIOLATION | $3,125 |
| May 25, 2021 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#39032505P ISSUED ON 11/24/2020 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.NO PERMIT FILED TO COR #35531361X | Nov 18, 2021 IN VIOLATION | $625 |
| Apr 5, 2021 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#39032505P ISSUED ON 11/24/20 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.NO PERMIT OR APPLICATION #35529020P | Mar 25, 2022 IN VIOLATION | $1,250 |
| Jan 25, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIO#39032505P ISSUED ON 11/24/2020 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. FOR WORK W/O A PERMIT. REMEDY #35527408M | Apr 29, 2021 DEFAULT | $6,250 |
| Nov 24, 2020 | Construction CLASS - 1 WORK W/O A PERMIT. NOTED AT CELLAR LEVEL: ERECTED FULL HEIGHT PARTITION WALLS WITH DOORS TO CREATE ADDITIONAL BEDROOM, BATHROOM AND LIVING ROOM. INSTALLED ADDITIONAL WATER AND WASTE LINES FOR RESIDENTIAL SINK A #39032505P | Sep 23, 2021 IN VIOLATION | $1,250 |
| Nov 24, 2020 | Unknown CLASS - 2 RESIDENCE CONVERTED MAINTAINED OR OCCUPIED AS A DWELLING FOR MORE THAN THE LEGALLY APPROVED NUMBER OF FAMILIES AUTHORIZED BY THE C OF O OR OFFICIAL DEPARTMENT RECORDS. DOB RECORDS INDICATES 21 APARTMENTS W/1 AT #39032504N | Sep 23, 2021 IN VIOLATION | $1,250 |
| Nov 24, 2020 | Construction CLASS - 1 WORK WITHOUT A PERMIT ON 11-24-2020 AT APPROX. 11:45AM I OBSERVED NEW GAS PIPING, FITTINGS AND VALVES INSTALLED AS A BYPASS TO FEED THE BOILER UNMETERED IN THE BASEMENT OF THE ABOVE MENTIONED ADDRESS, ALL WORK #39032470Y | Sep 23, 2021 IN VIOLATION | $1,250 |
| Nov 24, 2020 | Plumbing CLASS - 1 FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED ON 11-24-2020 AT APPROX. 11:45AM I OBSERVED NEW GAS PIPING, FITTINGS AND VALVES INSTALLED AS A BYPASS TO FEED THE BOILER UNMETERED IN THE BASEMENT OF THE AB #39032471X | Sep 23, 2021 IN VIOLATION | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #04693 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #09511 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #06156 | DOB VIOLATION - ACTIVE |
| Mar 24, 2022 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXP #1 OF 5 STORY OCCUPIED MULTIPLE DWELLING (1) FIRE-ESCAPE STAIR TREAD LOCATED BETWEEN 2ND AND 3RD FLOORS IS DETACHED FROM STRINGER CREATING AN IMMEDIATELY HAZARDOUS CONDITION. #22-00836 | DOB VIOLATION - ACTIVE |
| Oct 20, 2021 | PLUMBING FAILURE TO PROVIDE APPROVED / ACCEPTED PLANS AT JOB SITE AT TIME OF INSPECTION I OBSERVED AT TIME OF SPOT CHECK INSPECTION FOR ALL FLOOR GAS ROUGHING NO PLANS ON SITE JOB FOR NUMBER M00468023 #21-01320 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #01838 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #05161 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT #04135 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #02916 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| Dec 13, 2011 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 31, 2026 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE FLOOR AT BUILDING FRONT | Oct 5, 2026 |
| Apr 14, 2026 | B | Apt 34 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT WEST WALL IN THE KITCHEN LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | May 19, 2026 |
| Apr 14, 2026 | B | Apt 34 · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | May 19, 2026 |
| Apr 14, 2026 | B | Apt 34 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT NORTH WALL IN THE KITCHEN LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | May 19, 2026 |
| Apr 14, 2026 | B | Apt 34 · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | May 19, 2026 |
| Apr 14, 2026 | B | Apt 34 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ESCUTCHEON PLATE AT TOP OF HEAT RISER IN THE BATHROOM LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | May 19, 2026 |
| Apr 14, 2026 | B | Apt 34 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | May 19, 2026 |
| Mar 25, 2026 | B | Apt 54 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 18394506 ISSUED 21-NOV-25 HAS BEEN UPGRADED TO CLASS B PER ADMINI | Apr 29, 2026 |
| Dec 2, 2025 | C | Apt 31 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 31, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | Dec 16, 2025 |
| Nov 25, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT WEST WALL AT PUBLIC HALL, 4th STORY | Dec 30, 2025 |
| Nov 20, 2025 | C | Apt 54 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MISSING KNOB AT SHUT OFF VALVE AT RADIATOR AT WEST IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 26, 2025 |
| Nov 19, 2025 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM | Nov 25, 2025 |
| Nov 19, 2025 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT WEST WALL AT PUBLIC HALL, 4th STORY | Nov 25, 2025 |
| Nov 19, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL AT PUBLIC HALL, 4th STORY | Feb 22, 2026 |
| Nov 19, 2025 | C | Apt 54 · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 18, 2025 |
| Oct 1, 2025 | B | Apt 54 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 5, 2025 |
| Oct 1, 2025 | B | Apt 54 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 5, 2025 |
| Oct 1, 2025 | B | Apt 54 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 5, 2025 |
| Oct 1, 2025 | B | Apt 54 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 5, 2025 |
| Oct 1, 2025 | B | Apt 54 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 5, 2025 |
| Oct 1, 2025 | B | Apt 54 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 5, 2025 |
| Mar 25, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL AT PUBLIC HALL, 3rd STORY | Jun 28, 2025 |
| Apr 23, 2024 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE GARBAGE AT EAST YARD AT PUBLIC HALL, 1st STORY | May 28, 2024 |
| Apr 12, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BUILDING ENTRANCE AT PUBLIC HALL, 1st STORY | Apr 26, 2024 |
| Jan 19, 2024 | B | Apt 34 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SUBFLOORING WOOD IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 23, 2024 |
| Jan 19, 2024 | B | Apt 34 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 23, 2024 |
| Jan 19, 2024 | B | Apt 34 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 23, 2024 |
| Jan 19, 2024 | C | Apt 34 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR IN THE ENTRANCE LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 2, 2024 |
| Aug 31, 2023 | B | Apt 22 · § 27-2005 HMC: REFIT DOOR IN THE BATHROOM LOCATED AT APT 22, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 5, 2023 |
| Aug 31, 2023 | B | Apt 22 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE FOYER LOCATED AT APT 22, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 5, 2023 |
| Jun 26, 2023 | B | Apt 31 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL CEILING THROUGH OUT IN THE ENTIRE APARTMENT LOCATED AT APT 31, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Jul 31, 2023 |
| Jun 26, 2023 | B | Apt 31 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS THROUGH OUT IN THE ENTIRE APARTMENT LOCATED AT APT 31, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Jul 31, 2023 |
| May 3, 2023 | B | Apt 21 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SLOPING WOOD FLOOR IN THE FOYER LOCATED AT APT 21, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Jun 7, 2023 |
| May 3, 2023 | B | Apt 21 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). IN THE ENTIRE APARTMENT LOCATED AT APT 21, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Jun 7, 2023 |
| May 3, 2023 | B | Apt 21 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 21, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Jun 7, 2023 |
| May 3, 2023 | B | Apt 21 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 21, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Jun 7, 2023 |
| May 3, 2023 | B | Apt 21 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE FOYER LOCATED AT APT 21, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Jun 7, 2023 |
| May 3, 2023 | B | Apt 21 · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 21, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Jun 7, 2023 |
| May 3, 2023 | B | Apt 21 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 21, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Jun 7, 2023 |
| May 3, 2023 | C | Apt 21 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CELING IN THE KITCHEN LOCATED AT APT 21, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | May 9, 2023 |
| Apr 3, 2023 | B | Apt 32 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF BOLT LOCK INSTALED AT DOOR IN THE ENTRANCE LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | May 8, 2023 |
| Dec 30, 2022 | B | Apt 54 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 3, 2023 |
| Dec 29, 2022 | A | Apt 31 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS THROUGH OUT IN THE ENTIRE APARTMENT LOCATED AT APT 31, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Apr 3, 2023 |
| Dec 14, 2022 | C | Apt 52 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) WES | Jan 7, 2023 |
| Sep 9, 2022 | B | Apt 43 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK IINSTALLED AT DOOR LEADING TO ROOM WITH FIRE ESCAPE IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 43, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Oct 14, 2022 |
| Aug 9, 2022 | C | Apt 34 · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE .... IN THE ENTIRE APARTMENT LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 23, 2022 |
| May 27, 2021 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILED FLOORS AT THE FIFTH,FOURTH, THIRD,SECOND AND FIRST STORY AT PUBLIC HALL | Jul 1, 2021 |
| Feb 14, 2020 | A | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SAFETY COVERS AT ELECTRIC OUTLET AT SOUTH WALL AT PUBLIC HALL, 1st STORY | May 19, 2020 |
| Dec 16, 2019 | A | Apt 53 · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION STORAGE COMPARTMENT ERECTED AT CEILING IN THE FOYER LOCATED AT APT 53, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Mar 20, 2020 |
| Dec 12, 2019 | A | Apt 43 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 43, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Mar 16, 2020 |
| Apr 25, 2018 | B | Apt 32 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | May 30, 2018 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 15, 2026 | ECB | Construction: FAILURE TO SUBMIT CERTIFICATE OF CORRECTION OF VIOLATION #39058778X ISSUED ON 03-24-2022 FOR FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER., FILE A CERTIFICATE OF CORRECTION | Open |
| Aug 31, 2026 | HPD B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE FLOOR AT BUILDING FRONT | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 9:51 AM ET. BBL 1021520041.