8 floors · 31 apartments · 32,508 sq ft · built 1910 · class D1 · owner of record: Nunz Realty, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 32,508 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $1,985,500 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 830 days | Filing window not open yet |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-29 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 1, 2026 | Construction CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. NOTED AT THE TIME OF INSPECTION I OBSERVED DEFECTIVE/INADEQUATE SHED CONDITIONS IE.DAMAGED/MISSING MUDSILL ON THE POST WHICH IS NOT IN COMPLIANCE WITH NY #35727062K | Jun 3, 2027 DEFAULT | $5,000 |
| Apr 20, 2026 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE CYCLE 6 AND 7A REPORT INDICATING CORRECTIONOF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #706511. AGG2 HISTORY OF NONCOMPLIANCE ON 37026089 #37036417K | Jul 16, 2026 DEFAULT | $10,000 |
| Apr 8, 2025 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C AND 9C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #906511. AGG2 HISTORY OF NONCOMP #37034427P | Jun 26, 2025 DEFAULT | $10,000 |
| Mar 18, 2025 | Construction CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS: AT TIME OF INSPECTION IT WAS OBSERVED AT SIDEWALK SHED INSTALLED AT EXPOSURE 1(N. ELEV.) DETERIORATED/DAMAGED MUDSILLS. REMEDY: COMPLY TO CODE SPECIFICAT #35689895K | May 22, 2025 DEFAULT | $10,000 |
| Nov 6, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR FACADE AND APPURTENANCES. NOTE:(1)CRACKED/SPALLING TERRA-COTTA AT 8TH AND 6TH STORY WINDOWS AT EXPOSURE #1 NORTH ELEVATION. REMEDY: MAINTAIN EXTERIOR FACADE, TAKE SAFETY MEASURES, A #35686907P | Jan 16, 2025 DEFAULT | $6,250 |
| Jan 16, 2024 | Local Law CLASS - 2 22D2DRE TO FILE ACCEPTABLE AMENDED CYCLE 6 AND 7C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28.302.5 FOR CONTROL#706511.AGG1:PRIOR NOV 37022215P UNDER 28 #37026089L | Apr 11, 2024 DEFAULT | $10,000 |
| Oct 19, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#806511.AGG2 HISTORY OF NONCOMPLIANCE ON #37022806R | Feb 2, 2023 DEFAULT | $10,000 |
| Oct 8, 2021 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 6 & 7C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL#706511. REMEDY: FILE ACCEPTABLE REPORT. #37022215P | Mar 3, 2022 DEFAULT | $0 |
| Feb 13, 2020 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#806511. REMEDY: SUBMIT ACCEPTABLE REQUIRE #37018401R | Sep 16, 2021 IN VIOLATION | $0 |
| Nov 25, 2019 | Construction CLASS - 1 FAILURE TO TAKE AND PROVIDE SAFETY SIDEWALK SHED NETTING ETC.MEASURES WHERE REQUIRED TO PROTECT AND SECURE PUBLIC SAFETY FROM DOCUMENTS UNSAFE FACADE BUILDING FACCADES FILED UNSAFE BY PE/RA 1/11/2012.NO SAFETY #35365886H | Nov 18, 2021 IN VIOLATION | $0 |
| Nov 7, 2016 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED REPROT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LOCAL LAW 11/98 REPORT.AGG1 PRIOR NOV 36027516P UNDER 28-302.5.RMDY: FILE ACCEPTABLE AMENDED REPORT. #37001748P | Apr 20, 2017 DEFAULT | $0 |
| Sep 3, 2015 | Construction CLASS - 1 FAILURE TO TAKE AND PROVIDE ADEQUATE SAFETY MEASURES WHERE REQUIRED TO PROTECT AND SECURE PUBLIC SAFETY FROM UNSAFE FACADE AS PER 1RCNY 103-04 FACADE TECHNICAL REPORT FILE UNSAFE BY PE/RA ON 1/11/12 NO AMENDED #35133584J | Oct 22, 2015 IN VIOLATION | $0 |
| Sep 3, 2015 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BLDGS A/C UNITS NOT INSTALLED AS PER CODE(TYPICAL)OWL AND RED OBJECT ON WINDOW SILLS PLANTS ON 8 FLOOR TRIM ELEV.NORTH EXP.1.EAST ELEV.EXP.2 PARAPET MISSING MORTAR-DEFECTIVE WINDOW #35133585L | Oct 22, 2015 IN VIOLATION | $0 |
| May 29, 2015 | Local Law CLASS - 2 FAILURE TO FILE AN ACCEPTABLE AMENDED CYCLE 7 REPORT TO THIS DEPARTMENT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LOCAL LAW FISP REPORT.REM:FILE AN AMENDED REPORT FOLLOWING REMEDIAL REPAIR #36027516P | Dec 10, 2015 IN VIOLATION | $0 |
| Nov 28, 2014 | Local Law CLASS - 2 FAILURE TO FILE AN ACCEPTABLE AMENDED CYCLE 7 REPORT TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LOCAL LAW FISP REPORT. REMEDY: FILE AN AMENDED REPORT FOLLOWING REMEDIAL REPAIR #36026500X | Mar 12, 2015 IN VIOLATION | $0 |
| Dec 15, 2011 | Local Law CLASS - 2 FAILURE TO FILE AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCEW/CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY ARTICLE 28.302 AND THE DOB'S RULES AND REGULATIONS. #36017863K | Apr 12, 2012 IN VIOLATION | $0 |
| Jan 25, 2011 | Local Law CLASS - 2 FAILURE TO FILE AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCEW/CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY ARTICLE 28.302 & THE DOB RULES & REGULATIONS. REMEDY #36016088Y | Jul 14, 2011 DEFAULT | $0 |
| Jul 17, 2010 | Local Law CLASS - 2 FAILURE TO FILE AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE W/ CODE PROVISIONS PERIODIC INSP OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY ARTICLE 28.302 AND THE DOB RULES AND REGULATIONS REM: #36013910X | Sep 9, 2010 DEFAULT | $0 |
| Jun 4, 2010 | Local Law CLASS - 2 FAILURE TO FILE AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY ARTICLE 28.302 AND THE DEPARTMENT OF BUILDIN #36013304X | Aug 19, 2010 DEFAULT | $0 |
| Mar 13, 2009 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE W/CODE PROVISIONS:PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY ARTICLE 28.302 AND THE DOB RULES & REGULATIONS #36008653H | Apr 15, 2010 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 1, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTED AT THE TIME OF INSPECTION I OBSERVED CRACKED STONE DAMAGED WINDOW LINTEL & LOOSE/DETERIORATED MORTAR JOINTS AT EXPOSURE 1. AT EXPOSURE 2, SPALLED /SPALLING BRICK/STUCCO & DETERIORATED WINDOW SILL OBSERVED ON MULTIPLE LOCATINS. REMEDY: RE #SR10902JR | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #04064 | DOB VIOLATION - ACTIVE |
| Jul 23, 2025 | PLUMBING BASED ON LIC # 1343 BEING INACTIVE, STOP ALL PLUMBING WORK UNDER JOB #110410289 IMMEDIATELY. #25-01741 | DOB VIOLATION - ACTIVE |
| Mar 18, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE AND APPURTENANCES IN A CO DE COMPLIANT MANNER.AT TIME OF INSPECTION,IT WAS OBSERVED AT EXP1 NORT H ELEV CRACKED STONE FACADE AT MULTIPLE LOCATIONS,CRACKED WINDOW SILL AND DETERIORATED MORTAR JOINTS.AT EXP2 EAST ELEV SPALLED BRICK/STUCCO WAS OBSERVED AT MU #SR10901MA | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00383 | DOB VIOLATION - ACTIVE |
| Aug 6, 2021 | CONSTRUCTION FAILURE TO COMPLY WITH PREVIOUS COMMISSIONER'S ORDER #112519CLLFJ04 AS OF 8/6/21 OWNER FAILED TO COMPLY WITH IMMED CURE ORDER. REMEDY: IMMED COMPLY WITH CODE AND COMMISSIONER'S ORDER #LLF01KI | DOB VIOLATION - ACTIVE |
| Feb 19, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00119 | DOB VIOLATION - ACTIVE |
| Nov 25, 2019 | CONSTRUCTION FTM EXTERIOR BUILDING FACADES AND APPURTENANCES. EXP NORTH ELEV 7FL CRACKED SPALLING MASONRY STONE. MASONRY BRICK AND DECORATIVE OWL EASR ELEV EXP 2 SPALLING MASONRY BRICK 6 FL.REMEDY: MAINTAIN EXTERIOR BLDG FACADE PROVIDE SAFETY MEAUSRES AS PER 1RCNY 103-04 #LLFJF04 | DOB VIOLATION - ACTIVE |
| Dec 2, 2015 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00064 | DOB VIOLATION - ACTIVE |
| Aug 15, 2012 | ELEVATOR #ACC101255 | DOB VIOLATION - ACTIVE |
| Jan 12, 2012 | LL11/98-LOCAL LAW 11/98 - FACADE #HAZ3195 | DOB VIOLATION - ACTIVE |
| Jan 12, 2012 | LL11/98-LOCAL LAW 11/98 - FACADE #HAZ3194 | DOB VIOLATION - ACTIVE |
| Nov 30, 2007 | LOCAL LAW 11/98 - FACADE #NRF44036 | DOB VIOLATION - ACTIVE |
| Jan 8, 1991 | ELEVATOR #1101C4 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Feb 19, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Apr 30, 2019 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019 | Active |
| Dec 2, 2015 | AEUHAZ FTC-AEU-HAZ | Active |
| Aug 15, 2012 | Elevators E | Active |
| Jan 12, 2012 | Facades LL11/98 CYCLE 6 UNSAFE REPORT FILED | Active |
| Jan 12, 2012 | Facades LL11/98 CYCLE 7C UNSAFE REPORT FILED | Active |
| Nov 30, 2007 | Facades LL1198 CYCLE 6 NO REPORT FILED | Active |
None open.