6 floors · 24 apartments · 20,566 sq ft · built 1926 · class D1 · owner of record: Trustees Of Columbia University
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 45 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 45 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 61 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 289 days | Registered through 2027-09-01 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-31 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 9, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#906801.REMEDY:SUBMIT ACCEPTABLE REQUIRE #37025165J | Mar 16, 2023 DEFAULT | $0 |
| Nov 21, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BLDG FACADE&APPURTENANCES.@EXP1N ELEVATION I OBSERVED SPALLED DECORATIVE STONE.@EXP2E I OBSERVED SPALLED BRICK.@EXP4S I OBSERVED DETERIORATED MORTAR JOINTS.ROOF LEVEL THERES CRACKED #35669477J | Feb 23, 2023 DEFAULT | $0 |
| Apr 9, 2019 | Unknown CLASS - 2 FAILURE TO POST OR DISTRIBUTE SAFE CONSTRUCTION BILL OF RIGHTS. NOTED:AT TIME OF INSPECTION OBSERVED NO SAFE CONSTRUCTION BILL OF RIGHTS POSTED AND TENANTS STATED THEY DID NOT RECEIVE ANYTHING. FAILURE TO POST #35404454N | Jun 7, 2019 IN VIOLATION | $0 |
| Apr 9, 2019 | Construction CLASS - 2 FAILURE TO PROVIDE APPROVED/ACCEPTED CONSTRUCTION DOCUMENTS AND AT JOBSITE AT TIME OF INSPECTION. NOTED:AT TIME OF INSPECTION OBSERVED WORK IN PROGRESS PLUMBER'S DEMO ASKED FOR PLANS THEY GAVE ME UNAPPROVED PLA #35404452J | Jun 6, 2019 IN VIOLATION | $0 |
| Apr 9, 2019 | Unknown CLASS - 2 FAILURE TO DISTRIBUTE/POST NOTICE OF TENANT PROTECTION PLAN. NOTED:AT TIME OF INSPECTION OBSERVED NO TENANT PROTECTION PLAN POSTED AND TENANTS STATED THEY DID NOT RECEIVE ANYTHING. FAILURE TO POST OR DISTRIBUTE #35404453L | Jun 6, 2019 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00671 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 27, 2016 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY | Sep 30, 2016 |
| Jun 27, 2016 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Sep 30, 2016 |
| Jun 27, 2016 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORY | Jul 5, 2016 |
| Mar 20, 2012 | C | Apt 4 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL, NORTH WALL, | Apr 15, 2012 |
| Mar 20, 2012 | C | Apt 4 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 2nd DOOR FRAME FROM WEST AT NORTH WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL, 2nd | Apr 15, 2012 |
| Mar 20, 2012 | C | Apt 4 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM NORTH AT EAST WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE 1st RO | Apr 15, 2012 |
| Mar 20, 2012 | A | Apt 4 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 4, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jun 23, 2012 |
| Mar 20, 2012 | C | Apt 4 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM NORTH AT EAST WALL, SOUTH WALL, EAST WALL IN THE BATHROOM LOCATED AT APT | Apr 15, 2012 |
| Mar 20, 2012 | B | Apt 4 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 4, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH | Apr 24, 2012 |
| Mar 20, 2012 | B | Apt 4 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EVIDENCE OF WATER LEAK AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 4, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH | Apr 24, 2012 |
| Mar 20, 2012 | B | Apt 4 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 4, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH | Apr 24, 2012 |
| Mar 20, 2012 | A | Apt 4 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 4, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jun 23, 2012 |
| Mar 20, 2012 | B | Apt 4 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL, CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 4, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH | Apr 24, 2012 |
| Mar 20, 2012 | A | Apt 4 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 4, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jun 23, 2012 |
| Mar 20, 2012 | C | Apt 4 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WEST WALL IN THE KITCHEN LOCATED AT APT 4, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH | Apr 15, 2012 |
| May 3, 2010 | B | Apt 4 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jun 7, 2010 |
| May 3, 2010 | B | Apt 4 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILINGS AND ALL WALLS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 4, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jun 7, 2010 |
| May 3, 2010 | A | Apt 4 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SLOPING WOOD FLOOR IN THE 4th ROOM FROM NORTH LOCATED AT APT 4, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Aug 6, 2010 |
| May 3, 2010 | B | Apt 4 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SLOPING WOOD FLOOR IN THE FOYER LOCATED AT APT 4, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jun 7, 2010 |
| May 3, 2010 | A | Apt 4 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 4, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Aug 6, 2010 |
| May 3, 2010 | B | Apt 4 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 4, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jun 7, 2010 |
| May 3, 2010 | A | Apt 4 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE BATHROOM LOCATED AT APT 4, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Aug 6, 2010 |
| May 3, 2010 | A | Apt 4 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING MARBLE SADDLE UNDER DOOR IN THE BATHROOM LOCATED AT APT 4, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Aug 6, 2010 |
| May 3, 2010 | B | Apt 4 · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE ENTRANCE LOCATED AT APT 4, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jun 7, 2010 |
| Apr 5, 2010 | A | § 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER FRONT AT FIRE ESCAPE | Jul 9, 2010 |
| Jun 10, 2008 | B | Apt 63 · D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILINGS AND WALLS 6TH STY NORTHEAST APT 63 THROUGHOUT. , SECTION '' '' | Jul 15, 2008 |
| Jun 10, 2008 | B | D26-10.01 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EXPOSED WIRE CEILING CELLAR EAST. | Jul 15, 2008 |
| Jun 10, 2008 | B | Apt 21 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CEILINGS 2 STY NORTHEAST APT 21 THRU OUT. , SECTION '' '' | Jul 15, 2008 |
| Jun 10, 2008 | B | Apt 34 · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ENTRANCE TO 3 STY FRONT WEST APT 34. , SECTION '' '' | Jul 15, 2008 |
| Jun 10, 2008 | B | D26-10.01, 10.05 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES 6 STY FRONT BALCONY. | Jul 15, 2008 |
| Jun 10, 2008 | B | Apt 44 · D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILINGS AND WALLS 4TH STY NORTHWEST APT 44 SOUTH AND EAST ROOMS. LOCATED AT APT 44 | Jul 15, 2008 |
| Jun 10, 2008 | B | Apt 63 · D26-10.01 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILE 6TH STY NORTHEAST APT 63 BATHROOM. , SECTION '' '' | Jul 15, 2008 |
| Sep 11, 2001 | B | Apt 4 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL AND CEILING AT 1st ROOM FROM NORTH AT WEST, 1st STORY, APARTMENT | Oct 21, 2001 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 8:56 PM ET. BBL 1019760037.