3 floors · 6 apartments · 3,791 sq ft · built 1819 · class C4 · owner of record: Ponte Equities Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 48 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 48 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 64 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 779 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 23, 2021 | Signs CLASS - 2 ZR-52-61 OUTDOOR SIGN STRUCTURE USE DISCONTINUED FOR MORE THAN TWO YEARS.MUST CONFORM TO CURRENT REGULATIONS-STRUCTION #1.REMEDY:REMOVE ILLEGAL STRUCTURE #35479030X | Sep 9, 2022 IN VIOLATION | $2,500 |
| Sep 23, 2021 | Signs CLASS - 2 ZR-52-61 OUTDOOR SIGN STRUCTURE USE DISCONTINUED FOR MORE THAN TWO YEARS.MUST CONFORM TO CURRENT REGULATIONS-STRUCTURE #2.REMEDY:REMOVE ILLEGAL STRUCTURE. #35479031H | Sep 9, 2022 IN VIOLATION | $2,500 |
| Mar 11, 2015 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERT OF OCCUPANCY OR BLDG DEPT RECORDS.OBSERVED THAT ALT II 121076076 WHICH EXPIRED 05/20/14 HAS CONVERTED 1ST FL FROM"RETAIL SPACE"TO PART OF A RESIDENTIAL DWELLING UN #35110941R | Oct 29, 2015 IN VIOLATION | $0 |
| Mar 10, 2015 | Construction CLASS - 2 WORK DOES NOT CONFORM TO APPROVED CONST DOCUMENTS &/OR APPROVED AMENDMENTS FOR THIS PROFESSINOALLY CERT SIGN JOB#122110928.NON-CONFORMING ISSUES NOTED;(1)PLAN STATES THAT PREMISES IS A M1-5 LIGHT MANUFACURING D #35110940P | Oct 29, 2015 IN VIOLATION | $0 |
| Mar 23, 2012 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTE:FACADE OF BUILDING IS CRACKED,LOOSE,BULGED & PULLING AWAY & DEFECTIVE BRICK WORK. REM:REPAIR OR/REPLACE DEFECTIVE FACADE. #34947234X | May 10, 2012 ADMIT/IN-VIO | $0 |
| Jul 27, 2009 | Construction CLASS - 2 SIDEWALK SHED DOES NOT BLDG CODE SPECS. NOTED: SHED AT EXP 3,1,2,UNDERPONT # 104318034. APPROX 6' OF PARAPET CAME DOWN TO SIDEWALK ANOTHER 6' IS LOOSE, PLANKING ON DECK IS ROTTEN & COLUMNS ARE NOT SECURED TOGE #34787907L | Sep 17, 2009 IN VIOLATION | $0 |
| Jun 8, 1998 | Construction Non-Hazardous WORK WITHOUT A PERMIT 5% OF EXCAVATION NOTED:-EXCAVATION AT CELLAR LEVEL APPROX 1'-0" OF EARTH REMOVED AT SOUTH/EAST AREA. NO WORK IN PROGRESS AT TIME OF INSPECTION. APPROX SIZE 2-'-0" LONG & 7'-0" WIDE & #34178625J | Aug 13, 1998 WRITTEN OFF | $0 |
| May 19, 1998 | Construction Non-Hazardous WORK WITHOUT A PERMIT 25% OF WORK DONE NOTED: INTERIOR DEMO IN PROGRESS AT 1FL 3 FL SOUTH PARTITIONS WALLS". NEW FLOORS & ROOF INSTALLED. NEW JOIST 2 FL 3 FL WITH NEW STAIRCASE. OPENING IN WALL AT 3 FL BUILDING #34178614Y | Jul 9, 1998 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 13, 2017 | CONSTRUCTION FAILURE TO CORRECT UNLAWFUL ARTERIAL ROOF SIGN STRUCTURES THAT EXCEED THE SURFACE AREA LIMITS IN AN M1-5 ZONE. ADVERTISING SIGN PERMIT SG122110928 WAS REVOKED ON 10/12/16. SIGN STRUCTURES WERE VACANT FOR MORE THAN TWO EARS WHICH IS A DISCONTINACE AS PER ZR52-61. ANY POTENTIAL NON CONFORMING STATUS W #SGSE1SR | DOB VIOLATION - ACTIVE |
| Sep 11, 2016 | CONSTRUCTION BORO-COMM HAS REVOKED ALL APPROVALS AND PERMITS UNDER APP#102825686 DUE TO INSUFFICIENT INFOMATION IN RESPONSE TO LETTER DATED 4/12/2016 OF INTENT TO REVOKE,THEREFORE: STOP ALL WORK EXCEPT TO MAKE SITE SAFE REMEDY/REQUIREMENTS: PROVIDE REQUIRED INFORMATION IMMEDIATELY #A0101CH | DOB VIOLATION - ACTIVE |
| Mar 16, 2015 | CONSTRUCTION BORO-COMM HAS ISSUED A NOTICE OF IMMEDIATELY STOP WORK ORDER #0101IS | DOB VIOLATION - ACTIVE |
| Feb 21, 2013 | CONSTRUCTION #FEU10101TDL | DOB VIOLATION - ACTIVE |
| Dec 28, 1998 | ELECTRIC SIGNS #0101BL | DOB VIOLATION - ACTIVE |
| Feb 11, 1992 | CONSTRUCTION #N2RS01 | DOB VIOLATION - ACTIVE |
| Mar 20, 1989 | ELECTRIC SIGNS #ST0204B | DOB VIOLATION - ACTIVE |
| Mar 20, 1989 | ELECTRIC SIGNS #ST0206B | DOB VIOLATION - ACTIVE |
| Mar 20, 1989 | ELECTRIC SIGNS #ST0205B | DOB VIOLATION - ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 13, 2026, 9:40 PM ET. BBL 1005950040.