5 floors · 75,241 sq ft · built 2005 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 45 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 75,241 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 166 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 166 days | Annual filing |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2084). Agency page | Dec 31, 2034 in 2967 days | Next due 2034 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 16, 2026 | Construction CLASS - 2 REISSUE ECB#35725343H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED NINE GLASS WALL VIEWING PANELS BROKEN/CRACKED ALONG THE GYMNASIUM.ALSO ONE BROKEN/CRACKED GLASS PANEL AT 4TH FLOOR NEXT TO ELEVA #35724855R | Aug 10, 2026 POP/IN-VIO | $0 |
| Sep 9, 2025 | Construction CLASS - 2 REISSUE #35689033R. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT MAIN CORRIDOR, BROKEN/CRACKED GLASS WALL VIEWING ALONG THE GYMNASIUM. ALSO CRACKED EXTERIOR WINDOW GLASS PANEL AT 4TH FLOOR BY #35725343H | Oct 3, 2025 POP/IN-VIO | $0 |
| Sep 16, 2024 | Construction CLASS - 2 REISSUE #3567481N. DATE OF ISSUE: 06/15/2023. FAILURE TO MAINTAIN BUILIDNG IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, I NOTED AND OBSERVED DURING INSPECTION OF MAIN HALLWAY GLASS WALL(GYM VIEW) PANEL. #35689033R | Oct 23, 2024 POP/IN-VIO | $0 |
| Jun 15, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: OBSERVED DURING INSPECTION OF MAIN HALLWAY GLASS WALL(GYM VIEW) PANEL, GLASS BROKEN/ CRACKED. REMEDY;REPAIR AND/OR REPLACE #35674817N | Jul 26, 2023 POP/IN-VIO | $0 |
| Feb 11, 2020 | Elevators CLASS - 2 RESTORE TO SERVICE SO INSPECTION CAN BE MADE BY THIS DEPARTMENT NYCDOB. #39017407X | Feb 21, 2020 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 10:25 PM ET. BBL 1020840129.