24 floors · 735 apartments · 686,208 sq ft · built 1964 · class RM · owner of record: Unavailable Owner
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 64 days | Annual |
| Annual boiler inspection (7 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-02 (Accepted). Agency page | Dec 31, 2026 in 64 days | 5 of 7 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 80 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $82,250 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 116 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 686,208 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 13 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1160 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 7279). Agency page | Dec 31, 2029 in 1160 days | Next due 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 22, 2023 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED ADDITIONAL PARKING SPOTS HAVE BEEN CREATED IN THE PARKING LOT. CONCRETE ISLANDS HAVE BEEN REMOVED TO CREATE SPACES. PEDESTRIAN SIDEWALK HAS BEEN MODIFIED MADE SMALLER IMPEDING PED #39100018J | Feb 21, 2025 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 2, 2019 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #02817 | DOB VIOLATION - ACTIVE |
| Feb 20, 2017 | FACADE SAFETY PROGRAM #HAZ86727 | DOB VIOLATION - ACTIVE |
| Feb 20, 2017 | FACADE SAFETY PROGRAM #HAZ86728 | DOB VIOLATION - ACTIVE |
| Jan 31, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 #01190 | DOB VIOLATION - ACTIVE |
| Jan 31, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 #01265 | DOB VIOLATION - ACTIVE |
| Mar 16, 2012 | CONSTRUCTION #1301RH | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 25, 2026 | Benchmarking - LL84 DQ-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 13) | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| May 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Feb 20, 2017 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Feb 20, 2017 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Jan 31, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 | Active |
| Jan 31, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 | Active |
| Mar 21, 2008 | Elevators LL1081 | Active |
| Mar 21, 2008 | Elevators LL1081 | Active |
| Mar 21, 2008 | Elevators LL1081 | Active |
| Mar 21, 2008 | Elevators LL1081 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 19, 2026 | B | Apt 18L · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING DOOR IN THE ENTRANCE LOCATED AT APT 18L, 18th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Nov 23, 2026 |
| Oct 19, 2026 | B | Apt 18L · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 18L, 18th STORY, 1st APARTMENT FROM SOUTH AT WEST , SEC | Nov 23, 2026 |
| Oct 19, 2026 | C | Apt 18L · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE IN THE ENTRANCE LOCATED AT APT 18L, 18th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Nov 2, 2026 |
| Oct 19, 2026 | A | §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMA | Jan 22, 2027 |
| Oct 19, 2026 | B | Apt 18L · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 18L, 18th STORY, 1st APARTMENT FROM SOUTH AT WEST , S | Nov 23, 2026 |
| Sep 18, 2026 | B | Apt 5K · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT 5K, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST | Oct 23, 2026 |
| Sep 18, 2026 | B | Apt 5K · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 5K, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST | Oct 23, 2026 |
| Jun 1, 2026 | C | Apt 22K · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 22K, 22nd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Jun 15, 2026 |
| Mar 4, 2026 | B | Apt 16J · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE TERRACE DOOR HANDLE IN THE 3rd ROOM FROM NORTH LOCATED AT APT 16J, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Apr 8, 2026 |
| Mar 4, 2026 | B | Apt 16J · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 16J, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Apr 8, 2026 |
| Sep 15, 2025 | B | Apt 16J · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 16J, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 20, 2025 |
| Sep 15, 2025 | B | Apt 16J · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 16J, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 20, 2025 |
| Sep 15, 2025 | B | Apt 16J · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 16J, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 20, 2025 |
| Sep 15, 2025 | B | Apt 16J · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WASHBASIN CABINET IN THE BATHROOM LOCATED AT APT 16J, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 20, 2025 |
| Sep 15, 2025 | C | Apt 16J · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR HINGES IN THE ENTRANCE LOCATED AT APT 16J, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Sep 29, 2025 |
| Sep 15, 2025 | B | Apt 16J · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 16J, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 20, 2025 |
| Aug 25, 2025 | B | Apt 16J · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 16J, 17th STORY, 3rd APARTMENT FROM NORTH AT EAST | Sep 29, 2025 |
| Aug 25, 2025 | B | Apt 16J · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FLOOR BOARD AT BASE CABINET AT WASH BASIN IN THE BATHROOM LOCATED AT APT 16J, 17th STORY, 3rd APARTMENT FROM NORTH AT EAST | Sep 29, 2025 |
| Aug 25, 2025 | C | Apt 16J · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE MAKE DOOR SELF-CLOSING IN THE ENTRANCE LOCATED AT APT 16J, 17th STORY, 3rd APARTMENT FROM NORTH AT EAST | Sep 8, 2025 |
| Aug 25, 2025 | B | Apt 16J · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOORS IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 16J, 17th STORY, 3rd APARTMENT FROM NORTH AT EAST | Sep 29, 2025 |
| Aug 25, 2025 | B | Apt 16J · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FLOOR BOARD AT BASE CABINET AT KITCHEN SINK IN THE KITCHEN LOCATED AT APT 16J, 17th STORY, 3rd APARTMENT FROM NORTH AT EAST | Sep 29, 2025 |
| Jul 24, 2025 | C | Apt 16J · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE PRESUMED LEAD PAINT THAT IS XRF TESTED INCONCLUSIVE AT 0.5 MG/CM2 (28 RCNY §11-07(B)) FROM REQUIRED WINDOW AND/O | Aug 17, 2025 |
| Jul 23, 2025 | C | Apt 16J · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE MAKE THE ENTRANCE DOOR SELF-CLOSING IN THE ENTRANCE LOCATED AT APT 16J, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Aug 6, 2025 |
| Jul 23, 2025 | B | Apt 16J · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK PARQUET WOOD FLOOR IN THE FOYER LOCATED AT APT 16J, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Aug 27, 2025 |
| Jul 23, 2025 | B | Apt 16J · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 16J, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Aug 27, 2025 |
| Jul 23, 2025 | B | Apt 16J · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK LAMINATE FLOOR PANELS IN THE 1st ROOM FROM NORTH LOCATED AT APT 16J, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Aug 27, 2025 |
| Jul 23, 2025 | B | Apt 16J · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK LAMINATE FLOOR PANELS IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 16J, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Aug 27, 2025 |
| Jul 23, 2025 | A | Apt 16J · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st DOOR FROM SOUTH AT WEST WALL IN THE FOYER LOCATED AT APT 16J, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 26, 2025 |
| Jul 23, 2025 | A | Apt 16J · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 3rd ROOM FROM NORTH LOCATED AT APT 16J, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 26, 2025 |
| Jul 23, 2025 | B | Apt 16J · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 16J, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Aug 27, 2025 |
| Jun 3, 2024 | B | Apt 10F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILE IN THE PRIVATE HALLWAY LOCATED AT APT 10F, 10th STORY, 4th APARTMENT FROM NORTH AT EAST , SECTION ''601A'' | Jul 8, 2024 |
| Jun 3, 2024 | B | Apt 10F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILE IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 10F, 10th STORY, 4th APARTMENT FROM NORTH AT EAST , SECTION ''601A'' | Jul 8, 2024 |
| Jun 3, 2024 | B | Apt 10F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILE IN THE 6th ROOM FROM EAST LOCATED AT APT 10F, 10th STORY, 4th APARTMENT FROM NORTH AT EAST , SECTION ''601A'' | Jul 8, 2024 |
| Jun 3, 2024 | A | Apt 6G · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''601A'' | Sep 6, 2024 |
| Jun 3, 2024 | A | Apt 6G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''601A'' | Sep 6, 2024 |
| Jun 3, 2024 | A | Apt 6G · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''601A'' | Sep 6, 2024 |
| Jun 3, 2024 | A | Apt 6G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''601A'' | Sep 6, 2024 |
| Mar 4, 2024 | B | Apt 10F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SLIDING METAL DOOR TO BALCONY IN THE 1st ROOM FROM NORTH LOCATED AT APT 10F, 10th STORY, 8th APARTMENT FROM NORTH AT EAST | Apr 8, 2024 |
| Feb 16, 2024 | B | Apt 10F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES AT FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 10F, 10th STORY, 4th APARTMENT FROM NORTH AT EAST | Mar 22, 2024 |
| Feb 16, 2024 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT BASEMENT AT PUBLIC HALL | May 21, 2024 |
| Feb 16, 2024 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT BASEMENT AT PUBLIC HALL | Mar 22, 2024 |
| Jan 24, 2024 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Apr 28, 2024 |
| Jan 24, 2024 | A | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY | Apr 28, 2024 |
| Jan 5, 2024 | B | Apt 10F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILE AT FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 10F, 10th STORY, 4th APARTMENT FROM NORTH AT EAST | Feb 9, 2024 |
| Jan 5, 2024 | B | Apt 10F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE VINYL FLOOR TILE IN THE 1st ROOM FROM NORTH LOCATED AT APT 10F, 10th STORY, 4th APARTMENT FROM NORTH AT EAST | Feb 9, 2024 |
| Jan 5, 2024 | B | Apt 10F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH IN THE 2nd ROOM FROM NORTH LOCATED AT APT 10F, 10th STORY, 4th APARTMENT FROM NORTH AT EAST | Feb 9, 2024 |
| Jan 5, 2024 | B | Apt 10F · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE LOWER WINDOW SASH IN THE 2nd ROOM FROM NORTH LOCATED AT APT 10F, 10th STORY, 4th APARTMENT FROM NORTH AT EAST | Feb 9, 2024 |
| Jan 5, 2024 | B | Apt 10F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILE AT FLOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT 10F, 10th STORY, 4th APARTMENT FROM NORTH AT EAST | Feb 9, 2024 |
| Jan 5, 2024 | B | Apt 10F · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE LOWER WINDOW SASH IN THE 1st ROOM FROM NORTH LOCATED AT APT 10F, 10th STORY, 4th APARTMENT FROM NORTH AT EAST | Feb 9, 2024 |
| Jan 5, 2024 | B | Apt 10F · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE SLIDING DOOR TO BALCONY IN THE 1st ROOM FROM NORTH LOCATED AT APT 10F, 10th STORY, 4th APARTMENT FROM NORTH AT EAST | Feb 9, 2024 |
| Aug 14, 2023 | B | Apt 10F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILE AT FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 10F, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 18, 2023 |
| Aug 14, 2023 | A | Apt 10F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER GLASS PANE WINDOW NOT LOCKING IN THE 1st ROOM FROM EAST LOCATED AT APT 10F, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 17, 2023 |
| Aug 14, 2023 | B | Apt 10F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER AND LOWER GLASS WINDOW NO LOCKING IN THE 2nd ROOM FROM EAST LOCATED AT APT 10F, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 18, 2023 |
| May 3, 2023 | B | Apt 5C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 7, 2023 |
| Feb 24, 2023 | B | § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. | Mar 31, 2023 |
| Feb 22, 2022 | A | Apt 11J · § 27-2005 ADM CODE REFIT DOORS AT SOUTH WALL CLOSET IN THE FOYER LOCATED AT APT 11J, 12th STORY, 3rd APARTMENT FROM SOUTH AT WEST | May 28, 2022 |
| Dec 20, 2021 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Mar 25, 2022 |
| Dec 20, 2021 | A | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX AT PUBLIC HALL, 1st STORY | Mar 25, 2022 |
| Dec 20, 2021 | A | § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. | Mar 25, 2022 |
| Dec 20, 2021 | B | Apt 2F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2F, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST | Jan 24, 2022 |
Showing 60 of 97. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 19, 2026 | HPD B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING DOOR IN THE ENTRANCE LOCATED AT APT 18L, 18th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Open |
| Oct 19, 2026 | HPD B | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 18L, 18th STORY, 1st APARTMENT FROM SOUTH AT WEST , SEC | Open |
| Oct 19, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE IN THE ENTRANCE LOCATED AT APT 18L, 18th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Open |
| Oct 19, 2026 | HPD A | §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMA | Open |
| Oct 19, 2026 | HPD B | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 18L, 18th STORY, 1st APARTMENT FROM SOUTH AT WEST , S | Open |
| Sep 25, 2026 | DOB Safety | Benchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Open |
| Sep 18, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT 5K, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST | Open |
| Sep 18, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 5K, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 8:52 AM ET. BBL 3072797501.