4 floors · 33,600 sq ft · built 1899 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 68 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 33,600 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-03 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 1, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT 4TH FL HALLWAY SMOKE DOOR NEAR RM 407 IN DISREPAIR/NOT CLOSING/MISSING CLOSERWHEN TESTED.REM:REPAIR AND/OR REPLACE. #35732791R | Jun 1, 2026 POP/IN-VIO | $0 |
| May 1, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:AT BASEMENT CAFETERIA 4TH FL GYM EMERGENCY LIGHTS NOT WORKING WHEN TES #35732790P | Jun 1, 2026 POP/IN-VIO | $0 |
| May 1, 2026 | Construction CLASS - 2 REISSUE ECB#35719741M FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT BASEMENT BOILER RMS.WATER PENETRATION/POROUS TO WALLS/FLOORS DETERIORATING WITH SPALLING PLASTER/PAINT/MASON TO WALLS/FLOORS #35732788X | Jun 1, 2026 POP/IN-VIO | $0 |
| May 1, 2026 | Construction CLASS - 2 REISSUE ECB#35719740K FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT 2ND AND 4TH FLOORS ALL STAIRCASS UNEVEN/LIFTING DETERIORATING THROUGHOUT VARIOUS AREAS.REM:REPAIR AND/OR REPLACE. #35732789H | Jun 1, 2026 POP/IN-VIO | $0 |
| May 2, 2025 | Construction CLASS - 2 REISSUE #35677522J: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: OBSERVED AT BASEMENT LEVEL, BOILER ROOMS, BRICK/MASONRY ARE DETERIORATED AND SPALLING, WATER INFILTRATION FROM FOUNDATION WALLS. REMEDY #35719741M | Jun 5, 2025 POP/IN-VIO | $0 |
| May 2, 2025 | Construction CLASS - 2 REISSUE #35671971H: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: OBSERVED AT EXP 2, 3 AND 4 EXTERIOR GUTTER/LADDER IN DETERIORATED/RUST CONDITION. REMEDY: REPAIR AND/OR REPLACE. #35719742Y | Jun 5, 2025 POP/IN-VIO | $0 |
| May 2, 2025 | Construction CLASS - 2 REISSUE #35677523L: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: OBSERVED AT 2ND FLOORS AND 4TH FLOORS LEVEL STAIRCASE. ONE IN DETERIORATED CONDITION. REMEDY: REPAIR AND/OR REPLACE. #35719740K | Jun 5, 2025 POP/IN-VIO | $0 |
| May 6, 2024 | Construction CLASS - 2 REISSUE#35671973L FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT TIME OF MY INSPECTION I OBSERVED AT THE CELLAR LEVEL AT BOILER ROOM WALL SPALLING BRICK ARE ERRODING AND WATER LOGGED MISSING MASONRY I #35677522J | Jul 24, 2024 POP/IN-VIO | $0 |
| Mar 14, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:OBSERVED DURING INSPECTION OF STAIRWELL LANDING FROM 2ND FLOOR TO 4TH FLOOR ARE IN DISREPAIRM,ON EVEN,OVARY CAUSING A TRIP HAZARD.REM:REPAIR AND/OR RE #35671972J | Jun 21, 2023 POP/IN-VIO | $0 |
| Mar 14, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPIANT MANNER.NOTED:OBSERVED DURING INSPECTION OF BOILER ROOM WALLS,SPALLING BRICKS ARE ERRODING AND WATER LOGGED MISSING MASONRY IN JOINTS ALL THROUGHOUT.REM:REPAIR AND/O #35671973L | Jun 21, 2023 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 8:36 AM ET. BBL 3033170001.