Manhattan · Block 2115 · Lot 34 · 10032

500 West 157 Street

5 floors · 13 apartments · 11,391 sq ft · built 1910 · class C7 · owner of record: Amsterdam Gates Housing Development Fund Corporati

19open violations
$0ECB/OATH penalties owed
2HPD class C (immediately hazardous)
46dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 46 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 62 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 290 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 411 days
Next cycle year 2027
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-05 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Feb 27, 2018Construction CLASS - 2
WORK WITHOUT A PERMIT.NOTED:AT FIRST FLOOR AT THE FRONT OF BUILDING OBSERVED AN AWNING APPROX.30 FT IN LENGTH, AND 4 FEET IN WIDTH WITH SIGNTHAT READS 157 DELI OPEN 24 HRS.ALSO THE SIGNS WERE ILLUMINATED.REM:OB
#35316986Y
Oct 4, 2018
IN VIOLATION
$0
DOB (3)
IssuedViolationStatus
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#27716
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#28889
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#04665
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 12)
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
HPD (11) · C 2 · B 6 · A 3
IssuedClassViolationCorrect by
Oct 17, 2024CApt 4W · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 4W, 4th STORY, 1st APARTMENT FROM SOUTH AT WESTOct 31, 2024
Oct 17, 2024BApt 4W · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 4W, 4th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 21, 2024
Oct 17, 2024BApt 4W · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 4W, 4th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 21, 2024
Oct 17, 2024CApt 4W · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 4W, 4th STORY, 1st APARTMENT FROM SOUTH AT WESTOct 23, 2024
Nov 17, 2015BApt 3W · SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 3W, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTDec 22, 2015
Aug 25, 2015BApt 3W · SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WASH BASIN , IN THE BATHROOM LOCATED AT APT 3W, 3rd STORY, APARTMENT AT WESTSep 29, 2015
Aug 25, 2015AApt 3W · SECTION 27-2005 ADM CODE REFIT WINDOWS , IN THE ENTIRE APARTMENT LOCATED AT APT 3W, 3rd STORY, APARTMENT AT WESTNov 28, 2015
Aug 25, 2015BApt 3W · SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR ( OUT OF HINGHES ) IN THE 2nd ROOM FROM EAST LOCATED AT APT 3W, 3rd STORY, APARTMENT AT WESTSep 29, 2015
Aug 25, 2015AApt 3W · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING , IN THE ENTIRE APARTMENT LOCATED AT APT 3W, 3rd STORY, APARTMENT AT WESTNov 28, 2015
Aug 25, 2015BApt 3W · SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE UNEVEN WOOD FLOOR , IN THE KITCHEN LOCATED AT APT 3W, 3rd STORY, APARTMENT AT WESTSep 29, 2015
Jul 28, 2006ASECTION 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING.Nov 12, 2006

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 5:18 AM ET. BBL 1021150034.

Look up another building