63 floors · 186 apartments · 386,869 sq ft · built 2014 · class RM · owner of record: Unavailable Owner
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 386,869 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 17). Agency page | Dec 31, 2027 in 412 days | Next due 2027 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $46,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 464 days | No Cycle 10 report on record yet |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
| Annual boiler inspection (6 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-10 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 11, 2024 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #917414. REMEDY: SUBMIT ACCEPTABLE REQU #37027914R | Jul 24, 2025 IN VIOLATION | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #00812 | DOB VIOLATION - ACTIVE |
| Jan 23, 1989 | ELEVATOR (51) PROPERLY MOUNT TIMER BACK OF CONTROLLER (52) PROPERLY TAG GOVERNOR INDICATING 5YR TEST #1449A/02 | DOB VIOLATION - ACTIVE |
| Jan 23, 1989 | ELEVATOR 51-REPAIR MOTOR ROOM DOOR AND PROVIDE LOCK,CABLE FOR SAME 52- TAG GOVERNOR INDICATING 5YR TEST (53) REPAIR OVERHEAD GRATING 54-REPAIR OVERHEAD DOOR 55-REPAIR OVERHEAD STEPS 56-RESTORE CAB DOOR SAFETY EDGE 57- REPAIR CAB FLOOR 58- PROVIDE OUTSIDE COMMUNCIATON #1449A/03 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 9:33 AM ET. BBL 1000177501.