Brooklyn · Block 1881 · Lot 47 · 11205

50 Taaffe Place

3 floors · 20,000 sq ft · built 1930 · class F5 · owner of record: Taaffe Kzr Llc

28open violations
$48,155ECB/OATH penalties owed
0HPD class C (immediately hazardous)
799dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 799 days
Next cycle year 2028

Open violations

ECB / OATH (12) · $48,155 owed
IssuedViolationHearingBalance
Aug 28, 2026Unknown CLASS - 1
FAILURE TO FILE A REQUIRED TENANT PROTECTION PLAN. AT TIME OF INSPECTION, PERMIT B01369586-I1-GC FOR EXTERIOR FACADE WORK HAD NO TENANT PROTECTION PLAN FILED FOR THE EXTERIOR BRICK WORK. DUST AND DEBRIS WERE OB
#39202261R
Nov 4, 2026
PENDING
$10,000
Aug 28, 2026Unknown CLASS - 2
AT TIME OF INSPECTION OBSERVED: SUPPORTED SCAFFOLD IN PLACE AT EXPO# 2-4 NOT MAINTAINED, LOOSE PLANKS MISSING GUARDRAILS, LOOSE NEEDING DEBRIS THROUGHOUT CONTRARY TO BC 3314.4.8. MATERIALS, TOOLS, AND DEBRIS CO
#39558493N
Nov 4, 2026
PENDING
$2,500
Aug 28, 2026Construction CLASS - 1
FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. AT TIME OF INSPECTION, OBSERVED AT EXPOSURES 1 AND 2 AT STREET LEVEL, CONSTRUCTION DEBRIS, GARBAGE, AND MISCELLANEOUS MATERIALS STORED THROUGH
#39202260P
Nov 4, 2026
PENDING
$2,500
Aug 11, 2026Construction CLASS - 1
ATOI OBSERVED INTERIOR DEMOLITION/EXCAVATION WORK IN PROGRESS WITHIN THE CELLAR. A CHANNEL HAS BEEN CUT AND JACKHAMMERED THROUGH THE CONCRETE FLOOR SLAB WITH RUBBLE, DEBRIS AND EXCAVATION TOOLS PRESENT AROUND T
#39200071R
May 20, 2027
$2,500
Aug 5, 2026Construction CLASS - 2
ATOI OBSERVED FAILURE TO MAINTAIN PIPE SCAFFOLD IN A CODE COMPLIANT MANNER / CONTRARY TO APPROVED DOB PLANS FILED WITH THE DEPT. PIPE SCAFFOLD AT EXP 1,2 NOT FULLY PLANKED, PLANKS ARE NOT TIED DOWN, MISSING TOE
#39199241P
Apr 30, 2027
PENDING
$1,250
May 26, 2026Construction CLASS - 1
SUMMONS ISSUED FOR OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDING DEPARTMENT OF RECORDS. AT TIME OF INSPECTION OBSERVED MANUFACTURING BUILDING LOCATED IN A M1-2 LIGHT MANUFACTURI
#39189819N
Mar 1, 2027
PENDING
$2,500
May 26, 2026Construction CLASS - 1
SUMMONS ISSUED FOR CONSTRUCTION OR ALTERATION WORK W/O A PERMIT IN MANUFACTURING DISTRICT FOR RESIDENTIAL USE,AT TIME OF INSPECTION OBSERVED BEDROOMS, BATHROOM, LIVING ROOM AND KITCHEN CREATED WITHOUT PERMITS A
#39189820K
Mar 1, 2027
PENDING
$5,000
Apr 6, 2026Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MATTER. NOTED: FACADE IN STATE OF DISREPAIR WITH MISSING BRICKS, STEP CRACKS, AND LARGE CRACKS AT EXP-1,2, AND 4., REPAIR AND/REPLACE
#39183440L
May 3, 2027
DEFAULT
$2,530
May 7, 2025Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLAINT MANNER. AT THE TIME OF INSPECTION, I OBSERVED DEFECTS AT THE FRONT, LEFT, & RIGHT SIDE OF THE BUILDING. STEP CRACKS, MISSING MORTAR ON THE JOINTS, AND LOOSE WIND
#39147395N
Dec 7, 2026
$12,500
May 7, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, I OBSERVED THE LEFT SIDE STEPS IN STATE OF DISREPAIR. BROKE CMU BLOCKS AND LOOSE HANDRAILS. THE CONDITION POSTED A POTENTIAL F
#39147401K
Nov 20, 2026
$6,250
Nov 26, 2021Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35555238R ISSUED 8/17/21 AND FILE CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FAILURE TO MAINTAIN REAL BUILDING WA
#35565369X
Nov 7, 2022
IN VIOLATION
$625
Aug 12, 2008Construction CLASS - 2
ALTERED BLDG OCCUPIED W/O A VALID C OF O 3RD FL HAD BEEN CONVERTED INTO APTS AND DANCE AREA REMEDY: OBTAIN A VALID C OF O OR DISCONTINUE ILLEGAL OCCUPANCY
#34687750Y
Sep 29, 2008
WRITTEN OFF
$0
DOB (8)
IssuedViolationStatus
May 9, 2025CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLAINT MANNER. AT THE TIME OF INSPECTION, I OBSERVED DEFECTS AT THE FRONT, LEFT, & RIGHT SIDE OF THE BUILDING. STEP CRACKS, MISSING MORTAR ON THE JOINTS, AND LOOSE WINDOW GUARDS ON THE 3 SIDES OF THE BUILDING. THE CONDITION POSES A POTENTIAL STRUCK HAZARD TO
#25-00795
DOB VIOLATION - ACTIVE
Mar 4, 2009ELEVATOR

#9011/298232
DOB VIOLATION - ACTIVE
Oct 8, 2008ELEVATOR

#9011/281392
DOB VIOLATION - ACTIVE
Feb 21, 2008ELEVATOR

#9011/240388
DOB VIOLATION - ACTIVE
Nov 20, 2006ELEVATOR

#9011/181951
DOB VIOLATION - ACTIVE
Mar 19, 2004ELEVATOR

#9013/395485
DOB VIOLATION - ACTIVE
Jan 28, 2003ELEVATOR

#9013/368147
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#02768
DOB VIOLATION - ACTIVE
DOB NOW Safety (10)
IssuedViolationStatus
Oct 2, 2026Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Report
Active
Sep 30, 2026AEUHAZ FTC-AEU-HAZ
Active
Sep 30, 2026AEUHAZ FTC-AEU-HAZ
Active
Aug 12, 2026AEUHAZ FTC-AEU-HAZ
Active
Jul 30, 2026AEUHAZ FTC-AEU-HAZ
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 3)
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 3)
Active
Aug 29, 2025Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
HPD (2) · C 0 · B 2 · A 0
IssuedClassViolationCorrect by
Sep 29, 2026BApt 3RDFLO · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER SASH AT EAST WALL. IN THE KITCHEN LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHNov 3, 2026
Sep 29, 2026BApt 3RDFLO · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH AT EAST WALL. IN THE BATHROOM LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHNov 3, 2026

Issued in the last 120 days

DateSourceWhatNow
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection ReportOpen
Sep 30, 2026DOB SafetyAEUHAZ: Open
Sep 30, 2026DOB SafetyAEUHAZ: Open
Sep 29, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER SASH AT EAST WALL. IN THE KITCHEN LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Sep 29, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH AT EAST WALL. IN THE BATHROOM LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Aug 28, 2026ECBUnknown: FAILURE TO FILE A REQUIRED TENANT PROTECTION PLAN. AT TIME OF INSPECTION, PERMIT B01369586-I1-GC FOR EXTERIOR FACADE WORK HAD NO TENANT PROTECTION PLAN FILED FOR THE EXTERIOR BRICK WORK. DUST AND DEBRIS WERE OBOpen
Aug 28, 2026ECBUnknown: AT TIME OF INSPECTION OBSERVED: SUPPORTED SCAFFOLD IN PLACE AT EXPO# 2-4 NOT MAINTAINED, LOOSE PLANKS MISSING GUARDRAILS, LOOSE NEEDING DEBRIS THROUGHOUT CONTRARY TO BC 3314.4.8. MATERIALS, TOOLS, AND DEBRIS COOpen
Aug 28, 2026ECBConstruction: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. AT TIME OF INSPECTION, OBSERVED AT EXPOSURES 1 AND 2 AT STREET LEVEL, CONSTRUCTION DEBRIS, GARBAGE, AND MISCELLANEOUS MATERIALS STORED THROUGHOpen
Aug 12, 2026DOB SafetyAEUHAZ: Open
Aug 11, 2026ECBConstruction: ATOI OBSERVED INTERIOR DEMOLITION/EXCAVATION WORK IN PROGRESS WITHIN THE CELLAR. A CHANNEL HAS BEEN CUT AND JACKHAMMERED THROUGH THE CONCRETE FLOOR SLAB WITH RUBBLE, DEBRIS AND EXCAVATION TOOLS PRESENT AROUND TClosed
Aug 5, 2026ECBConstruction: ATOI OBSERVED FAILURE TO MAINTAIN PIPE SCAFFOLD IN A CODE COMPLIANT MANNER / CONTRARY TO APPROVED DOB PLANS FILED WITH THE DEPT. PIPE SCAFFOLD AT EXP 1,2 NOT FULLY PLANKED, PLANKS ARE NOT TIED DOWN, MISSING TOEOpen
Jul 30, 2026DOB SafetyAEUHAZ: Closed
Jul 30, 2026DOB SafetyAEUHAZ: Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 5:39 AM ET. BBL 3018810047.

Look up another building