Staten Island · Block 3303 · Lot 18 · 10304

50 Jefferson Street

3 floors · 72,900 sq ft · built 1931 · class W1 · owner of record: Nyc Department Of Education

6open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
164dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 43 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 72,900 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 164 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 164 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1139 days
Next cycle year 2029
Energy audit and retro-commissioning (2033) Likely applies
Local Law 87 · Calendar year 2033
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3303). Agency page

Dec 31, 2033
in 2600 days
Next due 2033
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-24 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (4)
IssuedViolationHearingBalance
Jun 14, 2023Construction CLASS - 2
RE-ISSUE #35665402R FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: THE SCHOOL'S FLAGPOLE IS MOUNTED ON THE ROOF AND IS NOT OPERATIONAL. THE MECHCANICAL PARTS ARE PROGRAM AND/OR DAMAGED. NO FLAGS
#35672287X
Oct 18, 2023
POP/IN-VIO
$0
Jun 14, 2023Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: THE DOOR LEADING OUT TO THE ROOF FROM THE BULKHEAD IS DAMAGED, DETERIORATING, DIFFICULT TO OPERATE AND FLIES OPEN WITH THE FAULTY LATCH. THIS UNIT N
#35672288H
Oct 18, 2023
POP/IN-VIO
$0
Jul 1, 2022Construction CLASS - 2
RE-ISSUE#35561424L FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT T.O.I. THE FLAGPOLE AT THE ROOF LEVEL ABOVE THE MAIN ENTRY IS NON USABLE BECAUSE OF BROKEN PULLEYS. THIS PROBLEM IS ONGOING
#35665402R
Aug 17, 2022
POP/IN-VIO
$0
Jul 2, 2021Construction CLASS - 2
FAILURE TO MAINTAIN BLDG TO CODE.REISSUE35495347Y.OBSERVED@TOI FLAGPOLE@ROOF LEVEL OVER FRONT ENTRY HAS BROKEN PULLEYS&ROPES&ISNT USABLE.THIS IS ONGOING FOR YRS.SHOULD BE CORRECTED SO FLAG CAN BE FLOWN PROUDLY.
#35561424L
Oct 6, 2021
POP/IN-VIO
$0
DOB (0)

None open.

DOB NOW Safety (2)
IssuedViolationStatus
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 18, 2026, 3:06 AM ET. BBL 5033030018.

Look up another building