Queens · Block 2438 · Lot 34 · 11377

50-30 69 Place

1 floors · 5,850 sq ft · built 1956 · class G1 · owner of record: Aniko Holding Corp

3open violations
$149ECB/OATH penalties owed
0HPD class C (immediately hazardous)
1159dto Gas piping inspection (2029 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 63 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1159 days
Next cycle year 2029

Open violations

ECB / OATH (2) · $149 owed
IssuedViolationHearingBalance
Nov 1, 2021Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #39022048J ISSUED 5/8/20 AND FILE CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1RCNY 102-01(D)(2)ACCEPTABLE CERTIFICATE HAS NOT B
#37021946Y
Feb 8, 2022
DEFAULT
$149
May 8, 2020Construction CLASS - 2
OFFICE SPACE CREATED AT FRONT SECTION ON 1 STORY GARAGE WITH NON FIRE RETARDANT MATERIALS (SHEET ROCK AND WOOD STUDS) MEASURING APPROXIMATELY 8 FEET WIDTH BY 18 FEET LENGTH BY 10 FEET HEIGHT. WORK COMPLETED WIT
#39022048J
Jun 23, 2020
STIPULATION/IN-VIO
$0
DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 2)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 29, 2026, 7:13 AM ET. BBL 4024380034.

Look up another building