1 floors · built 1950 · class G0 · owner of record: Huamei Property Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1139 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 10, 2026 | Site Safety CLASS - 1 @NB SITE IN EXCAVATION PHASE OBSERVE EXCAVATION APPROX.40'L X 12'W X 12'D ALONG EXP#2 ADJACENT TO NEIGHBOR PROPERTIES GARAGES/SHED WITHIN EXCAVATION INFLUENCE&UPON REQUEST SITE PERSONNEL FOR PRECONSTRUCTION SUR #39558981M | Nov 17, 2026 PENDING | $2,500 |
| Sep 10, 2026 | Construction CLASS - 1 SUPPORT OF EXCAVATION.OBSERVE SITES EXCAVATION OPERATIONS NOT CONFORM TO PLANS AFFECTING HEALTH&LIFE SAFETY-EXP#2 EXCAVATION SHEAR CUT&SLOPE NOT MAINTAIN 45DEGRESS ADJACENT TO NEIGHBOR GARAGES POTENTIALLY COMPR #39558982Y | Nov 17, 2026 | $2,500 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 10, 2026 | ECB | Site Safety: @NB SITE IN EXCAVATION PHASE OBSERVE EXCAVATION APPROX.40'L X 12'W X 12'D ALONG EXP#2 ADJACENT TO NEIGHBOR PROPERTIES GARAGES/SHED WITHIN EXCAVATION INFLUENCE&UPON REQUEST SITE PERSONNEL FOR PRECONSTRUCTION SUR | Open |
| Sep 10, 2026 | ECB | Construction: SUPPORT OF EXCAVATION.OBSERVE SITES EXCAVATION OPERATIONS NOT CONFORM TO PLANS AFFECTING HEALTH&LIFE SAFETY-EXP#2 EXCAVATION SHEAR CUT&SLOPE NOT MAINTAIN 45DEGRESS ADJACENT TO NEIGHBOR GARAGES POTENTIALLY COMPR | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 4:07 AM ET. BBL 4052230042.